Recent Changes

From Railcam Support
Revision as of 18:16, 31 August 2024 by LaSERman (Talk | contribs)

Jump to: navigation, search
}
Diagram Changes - IN-PROGRESS
Diagram Notes Editor
Various Routes being added. GN
Diagram Changes - LIVE
Live Date Diagram Notes Editor
29-Aug-2024 Tyneside Route indication correction. GN
28-Aug-2024 Worksop Missing signal Boultham Jn. added. GN
28-Aug-2024 Reading Missing berths Reading platforms 1,2 and 3 added. GN
28-Aug-2024 Euston Watford North Jn. correction. GN
28-Aug-2024 Cardiff Cardiff camera location deleted. GN
26-Aug-2024 Blethchley Updated for East/West rail signalling and some additional information added. GN
25-Aug-2024 Chilterns Updated for East/West rail signalling. GN
25-Aug-2024 Claydon Signalling added. GN
24-Aug-2024 Leicester Missing signal Leicester UDGL added. Stamford tunnel added. GN
24-Aug-2024 EastYorks Siemens factory at Goole added. GN
07-Aug-2024 Exeter Available Dawlish Beach cameras updated. GN
07-Aug-2024 Brighton Gatwick Airport platform 6 and 7 layout updated. GN
07-Aug-2024 SouthLondon Balham platform numbers corrected, missing signal section Gyspy Hill-Crystal Palace added, missing crossover at Norwood Junction added. GN
07-Aug-2024 Euston Route indication at Wembley South Jn. corrected. GN
07-Aug-2024 Westhampstead Link to Kings Cross diagram corrected. GN
07-Aug-2024 Leicester Missing signal at Wellingborough added. GN
18-Jul-2024 Berwick Route indications updated and T&W Metro to Newcastle Airport added. GN
18-Jul-2024 Tyneside Route indications updated. GN
15-Jul-2024 Paddington Route indications at Acton Main Line corrected. GN
14-Jul-2024 Euston Route indications updated. GN
13-Jul-2024 Chilterns Missing signals at Bicester Village added. GN
13-Jul-2024 Berwick Route indications livened up. GN
13-Jul-2024 Tyneside Route indications livened up. GN
10-Jul-2024 Woking Basingstoke camera removed. GN
08-Jul-2024 Tyneside Some redrawing preparing for route indications. GN
02-Jul-2024 Pennines Corrections at Shepley fringe. GN
02-Jul-2024 Sheffield Corrections at Shepley fringe. GN
30-Jun-2024 Berwick Corrections to route indications. GN
29-Jun-2024 WestLondon Corrections at Wokingham fringe. GN
29-Jun-2024 Guildford Corrections at Wokingham fringe. GN
26-Jun-2024 Dorset Spurious coloured headcodes between sections removed. GN
26-Jun-2024 Bristol Mileage corrections in Weston-super-Mare area. GN
23-Jun-2024 SandC Ribblehead Station Inn cameras added. GN
05-Jun-2024 EastYorks Links to York diagram corrected. GN
04-Jun-2024 Berwick Preparatory work for route indications. GN
04-Jun-2024 Bristol Bridgwater mileage corrected. GN
01-Jun-2024 Erewash Some redrawing and missing signals added on Erewash route. Various links updated. GN
01-Jun-2024 Worksop Swinderby crossover abolished. Various links updated. GN
01-Jun-2024 EastYorks Hull platforms 6/7 engine release crossover abolished. Various links updated. GN
01-Jun-2024 Derby Burton-on-Trent platform numbering corrected. GN
01-Jun-2024 York Wensleydale Railway spelling corrected. GN
01-Jun-2024 Teesside Hartlepool platform numbering corrected. GN
01-Jun-2024 Tyneside Dinsdale station name added. GN
01-Jun-2024 Teesside Hartlepool platform numbering corrected. GN
30-May-2024 Carlisle Abolished crossover at Harrison's sidings removed. GN
30-May-2024 Motherwell Route corrections. GN
30-May-2024 Euston Route corrections. GN
15-May-2024 Cardiff Route corrections. GN
13-May-2024 WestSomerset Watchet cameras added. GN
11-May-2024 Euston Additional routes added and some corrections made. GN
11-May-2024 ArunValley Littlehampton SB orientation corrected. GN
06-May-2024 Euston Additional routes added. GN
30-Apr-2024 Euston Camden cameras updated and additional routes added. GN
29-Apr-2024 North London Camden camera3 relative location view added. GN
29-Apr-2024 Guildford Portcreek Jn. mileage corrected. GN
21-Apr-2024 Euston Second Watford camera added. Routes added in WJ TD area (Kings Langley - Wembley Central). GN
16-Apr-2024 Pennines Missing signals added in Marsden area. GN
16-Apr-2024 Plymouth Some additional detailing. GN
15-Apr-2024 Paddington Some route corrections and detailing. GN
12-Apr-2024 Berwick Some Blyth and Tyne route corrections and ECML sections updated with additional links etc. GN
06-Apr-2024 Berwick Blyth and Tyne route updated for new signalling. GN
01-Apr-2024 EastKent Various links updated. GN
01-Apr-2024 WestKent Various links updated. GN
01-Apr-2024 SoutheastLondon Various links updated. GN
01-Apr-2024 ArunValley Various links updated. GN
01-Apr-2024 Brighton Various links updated. GN
01-Apr-2024 SouthLondon Various links updated. GN
28-Mar-2024 Hope Valley Signal berth correction. GN
28-Mar-2024 Sheffield Signal berth correction. GN
28-Mar-2024 Tonbridge Various links updated. GN
28-Mar-2024 Chilterns Minor corrections. GN
26-Mar-2024 Hope Valley Signal berth corrections and missing signal added at Grindleford and additional details added. GN
26-Mar-2024 Sheffield Signal berth correction. GN
26-Mar-2024 Plymouth Missing signal at Ivybridge and additional details added. GN
26-Mar-2024 Cardiff Some route gif corrections and additional details added. GN
25-Mar-2024 Cardiff Routes added on several valley lines. GN
19-Mar-2024 Severn Valley Station links updated. GN
18-Mar-2024 Sheffield Updated for Hope Valley recontrol and double tracking through Dore station. GN
18-Mar-2024 Hope Valley East end of diagram updated for recontrol to York ROC. GN
18-Mar-2024 Plymouth Updated for Devon Banks resignalling. GN
13-Mar-2024 Cornwall Missing signal at Bodmin Parkway added. GN
13-Mar-2024 Woking Route indication at Basingstoke corrected. GN
11-Mar-2024 Cornwall Minor corrections to new signalling. GN
10-Mar-2024 Woking Updated for new Basingstoke cameras. GN
04-Mar-2024 Cornwall Updated for new signalling being installed Liskeard to Falmouth / Scorrier. GN
04-Mar-2024 Warrington Section Meols Cop to Burscough Bridge transferred to Merseyrail diagram. GN
04-Mar-2024 Merseyrail Section Meols Cop to Burscough Bridge added from Warrington diagram as new signalling added reporting on SS TD. GN
04-Mar-2024 Motherwell Cleland siding and crossover removed. GN
04-Mar-2024 Rugby Northampton Gateway terminal added. Plus some redrawing to improve layout. GN
23-Feb-2024 Kings Cross Updated with additional reporting sections. Some redrawing especially of Hertford Loop to improve diagram layout. GN
22-Feb-2024 Kings Cross Updated / corrrections after new signalling live. GN
20-Feb-2024 Kings Cross Updated for Welwyn to Arlesey resignalling / recontrol area. GN
19-Feb-2024 Guildford Fringe alterations now signalling changes at Wokingham live. GN
19-Feb-2024 Reading Fringe alterations now signalling changes at Wokingham live. GN
19-Feb-2024 WestLondon Minor corrections now signalling changes at Wokingham live. GN
15-Feb-2024 WestLondon Wokingham area signalling revised for upcoming recontrol. Routes added for Chiswick to Windsor/Egham area. GN
07-Feb-2024 Leeds Micklefield signal positions updated. GN
06-Feb-2024 S&C Helwith bridge camera added. Horton-in-Ribblesdale camera greyed out. Some links updated. GN
04-Feb-2024 GlasgowCentral WCML Quick links updated and route at Shields Jn. corrected. GN
04-Feb-2024 Motherwell WCML Quick links updated and Cambuslang inter-diagram link corrected. GN
04-Feb-2024 TrentValley Fringe berth links at Lichfield TV HL Jn. added.. GN
04-Feb-2024 Wolverhampton WCML Quick links updated. Some links added. GN
04-Feb-2024 Birmingham WCML Quick links updated. GN
04-Feb-2024 Preston Minor corrections. GN
01-Feb-2024 Carlisle WCML Quick links updated. GN
01-Feb-2024 Preston Carnforth areas improved. Many link added/updated. GN
01-Feb-2024 ManchesterSouth WCML Quick links updated. GN
01-Feb-2024 ManchesterWest WCML Quick links updated. GN
01-Feb-2024 NorthWales Mouldsworth link corrected. GN
01-Feb-2024 Stafford Stafford area redrawn. GN
01-Feb-2024 Stoke Colwich links corrected. GN
25-Jan-2024 Euston WCML Quick links updated. GN
25-Jan-2024 Bletchley WCML Quick links updated. GN
25-Jan-2024 Rugby WCML Quick links updated. GN
25-Jan-2024 Stoke WCML Quick links updated. GN
25-Jan-2024 Crewe WCML Quick links updated. GN
25-Jan-2024 Liverpool WCML Quick links updated. GN
25-Jan-2024 Warrington WCML Quick links updated. GN
25-Jan-2024 Preston WCML Quick links updated. Morecambe and Carnforth areas redrawn. GN
23-Jan-2024 Stafford Trent Valley area removed and links updated. GN
23-Jan-2024 Rugby Trent Valley area removed and links updated. GN
23-Jan-2024 TrentValley Corrections and fringe amendments now signalling live. GN
22-Jan-2024 TrentValley New diagram created to to cover WCML Trent Valley area being recontrolled from 23rd. GN
12-Jan-2024 Glasgow QS Minor corrections and additional links. GN
12-Jan-2024 Fife Minor corrections. GN
12-Jan-2024 Peterborough Route indication correction USL to platform 6 at Peterborough. Flood links for River Nene added. GN
08-Jan-2024 Glasgow QS Various links updated. Cadder HST depot dded, Stirling North signals amended, Falkirk area TDs updated for boundary changes. GN
08-Jan-2024 Fife Falkirk area altered for TD changes. GN
01-Jan-2024 Stoke Non-reporting berths north of Prestbury removed. GN
01-Jan-2024 Crewe Crewe South Jn. area route gifs updated. GN
01-Jan-2024 Eastleigh Southampton area route gifs updated. GN
01-Jan-2024 York Note added for train indications from Selby. Flood link for River Ouse added. GN
01-Jan-2024 Inverness Updated for In Section indications around Kennethmont area. GN
01-Jan-2024 Fife Leven branch signalling added. GN
01-Jan-2024 Westhampstead Updated for WH TD for St Pancras to Kentish Town area. GN
04-Dec-2023 LiverpoolStreet Updated for Q7 TD and some redrawing. GN
04-Dec-2023 NorthLondon Updated for Q7 TD and some redrawing. GN
01-Dec-2023 Derby Minor corrections. GN
26-Nov-2023 Edinburgh Minor corrections. GN
26-Nov-2023 Fife Minor corrections. GN
24-Nov-2023 Derby Redrawn to improve layout. Peak Rail and Ecclesbourne Valley Railway added. Wingfield cameras added. GN
16-Nov-2023 Manchester East Rawtenstall platform camera added. GN
15-Nov-2023 Edinburgh Some redrawing to improve layout. GN
14-Nov-2023 Fife Some redrawing to improve layout. Bo'ness & Kinniel Railway added. GN
12-Nov-2023 Inverness Various links updated. Route indication corrected at Aviemore. GN
12-Nov-2023 Aberdeen ECML quick link panel added. Various links updated. GN
09-Nov-2023 Newport Rogiet camera added. Some redrawing Severn Tunnel Jn. area. GN
08-Nov-2023 Bristol Weston-super-Mare camera added. GN
30-Oct-2023 Fife Updated for changes to EC and EE TDs. GN
15-Oct-2023 Crewe Minor corrections to route indications. GN
13-Oct-2023 Crewe Routing indications added for Crewe station and Gresty Lane areas. GN
13-Oct-2023 Peterborough Route indications from 78 signal to platforms 1, 2 and 3 corrected. GN
10-Oct-2023 March Diagram fringes updated to enable tracking of headcodes to adjacent diagrams. GN
09-Oct-2023 March Peterborough fringe updated for recontrol to York ROC. GN
06-Oct-2023 Warrington Updated for Headbolt Lane station opened. GN
06-Oct-2023 Merseyrail Updated for Headbolt Lane station opened. GN
06-Oct-2023 Tayside Whitemoss LC added. GN
04-Oct-2023 Peterborough Signal at Fletton Junction corrected. GN
02-Oct-2023 Leeds Missing signal at Horsforth added. GN
01-Oct-2023 Epping Epping camera 2 added. GN
26-Sep-2023 Tyneside Newcastle bay platforms signals corrected. Missing reporting signals added at Newcastle station and Tyne Yard. Some redrawing of other areas and Weardale Railway added. GN
26-Sep-2023 Peterborough Minor corrections to routes. GN
15-Sep-2023 Cardiff Minor corrections and Cardiff camera added. GN
10-Sep-2023 Peterborough Route indications corrected. GN
10-Sep-2023 Newcastle Newcastle camera added. TRTS indications added. GN
10-Sep-2023 Workington Maryport camera greyed out. Reverted to previous diagram on 12th September after camera reinstated GN
07-Sep-2023 Peterborough Minor corrections and route indications added. GN
06-Sep-2023 ManchesterEast Minor corrections and Heywood cameras added. GN
03-Sep-2023 Tayside Dunblane South crossover added. GN
02-Sep-2023 WestLondon Minor updates. GN
02-Sep-2023 SnowHill Some redrawing and Rowley Regis cameras added. GN
30-Aug-2023 Worksop Peterborough fringe area amended. GN
29-Aug-2023 Peterborough Various corrections and fringe berths amended. GN
29-Aug-2023 WestLondon Signalling in Chiswick/Windsor area updated for transfer to Basingstoke ROC. GN
26-Aug-2023 Peterborough Signalling updated for transfer to York ROC. GN
26-Aug-2023 Shenfield Minor corrections and routes live. GN
21-Aug-2023 Shenfield Minor updates and routes being added. GN
21-Aug-2023 Birmingham Corrections to Wylde Green and Four Oaks. Sutton Park and Cross City lines redrawn to improve layout. GN
01-Aug-2023 SnowHill Galton Bridge area redrawn. GN
01-Aug-2023 Birmingham Galton Bridge area redrawn. GN
01-Aug-2023 Bristol Portway Park and Ride note removed. GN
01-Aug-2023 LTSLines Barking Riverside note removed. GN
01-Aug-2023 Shenfield Shenfield sidings corrected and other minor corrections. GN
01-Aug-2023 Stafford Rugeley Engineers siding corrected. GN
28-Jul-2023 Seaton Seaton station camera added. GN
27-Jul-2023 Bletchley Minor alterations. GN
27-Jul-2023 Stafford Rugeley area updated and some other minor alterations. GN
17-Jul-2023 FarNorth Minor amendments. GN
17-Jul-2023 Shenfield Redrawn/updated and converted to wide format. GN
12-Jul-2023 FarNorth Basic train movements now shown at crossing points and in sections on lines north of Inverness to Kyle of Lochalsh, Wick and Thurso. GN
10-Jul-2023 SouthLondon Signal / crossover positions at Streatham South Jn. corrected. GN
10-Jul-2023 Guildford Various links updated. GN
10-Jul-2023 Pennines Mileage for Morley station updated as old station closed and new station opened nearby. GN
06-Jul-2023 Newport Newport tunnels corrected. Some other minor corrections to gifs and various links added/updated. GN
06-Jul-2023 Eastleigh Route corrected at Eastleigh going Up direction along the Down Slow line from signal 221. GN
06-Jul-2023 Exeter Routes amended to New Yard from platforms 1,2 and 3. Marsh Barton platform numbers added. River Exe flood level link added at Stafford's Bridge. GN
28-Jun-2023 Knottingley Minor corrections. Level crossings added on Knottingley to Shaftholme Jn section. GN
28-Jun-2023 Workington Missing crossover at Sellafield added. GN
28-Jun-2023 Westbury Missing signal at Theale added. GN
26-Jun-2023 Knottingley Various missing signals added. Some areas redrawn and detailed. GN
26-Jun-2023 Pennines Minor corrections. GN
26-Jun-2023 Edinburgh Additional signals TD altered. GN
23-Jun-2023 Edinburgh Portobello to Prestonpans signals TD altered. GN
21-Jun-2023 Leeds Batley area transferred to Pennines diagram. Signal locations corrected in Copley Hill East Jn. area. Ingrow West camera added. GN
21-Jun-2023 Pennines Dewsbury / Batley area updated and section transferred from Leeds diagram to match TDs. GN
16-Jun-2023 Pennines Sticking headcode in berth near Healey Mills corrected. New section for forthcoming signalling changes in Dewsbury / Batley area added. GN
16-Jun-2023 Peterborough Fringe signal berths to Kings Cross diagram at Sandy corrected. GN
15-Jun-2023 Worksop Fringe signal berths to Doncaster diagram on Newark/Lincoln line corrected. GN
15-Jun-2023 Motherwell Route gif at Shieldmuir corrected. GN
14-Jun-2023 Birmingham Missing signal berth at Grand Jn. added. Proposed Camp Hill line stations mileages amended. GN
14-Jun-2023 Cambrian Caersws area. Missing berth added and problem of headcodes not stepping in that area corrected. GN
12-Jun-2023 Whitby Station links corrected. GN
08-Jun-2023 Whitby Various links updated and NYMR cameras made blue as non-Railcam. GN
08-Jun-2023 Berwick Marchey's House apostrophe removed. GN
08-Jun-2023 Tyneside Fringe berths on Tyne Valley and Stillington lines updated. GN
08-Jun-2023 Teesside Grangetown area signals corrected / others added and Wilton area redrawn. GN
08-Jun-2023 York Various shunt signals that report added in Tollerton / Thirsk / Northallerton areas which have been redrawn. GN
28-May-2023 Wrexham Llangollen Railway extension and some additional information added. GN
24-May-2023 West Wales Minor corrections. GN
24-May-2023 Port Talbot Minor corrections. GN
21-May-2023 West Wales Llanelli area resignalling. GN
21-May-2023 Port Talbot Swansea District and Llanelli area resignalling. GN
21-May-2023 Cardiff A few minor corrections and some more detailing. GN
12-May-2023 Cardiff Valley lines layout improved and detailing added. GN
12-May-2023 Peterborough Peterborough 5 camera added. Proposed USL Connington / Huntingdon deleted. GN
12-May-2023 Tyneside Newcastle platform 12 abolished. Stillington branch signals corrected. GN
03-May-2023 Cardiff Cardiff Valleys redrawn for new C0 TD. GN
01-May-2023 Plymouth Missing signals St. Germans / Menheniot added. GN
28-Apr-2023 Plymouth Saltash cameras added. GN
25-Apr-2023 Euston Stonebridge Park route updated. GN
24-Apr-2023 Euston Watford North Jn. updated. GN
24-Apr-2023 Motherwell Minor route corrections. GN
20-Apr-2023 ManchesterSouth Altrincham 2 camera added. GN
19-Apr-2023 HopeValley Chinley camera added. GN
06-Apr-2023 ManchesterEast Corrections to berths Stalybridge towards Diggle. GN
06-Apr-2023 Motherwell Minor corrections to routes. GN
24-Jan-2023 Crewe Crewe (LSL) Independent camera added. GN
01-Apr-2023 Motherwell Routes added. GN
02-Mar-2023 Workington Maryport camera added. GN
27-Mar-2023 GSW Converted to wide format and Sanquhar camera greyed out. GN
27-Mar-2023 York Links updated. GN
27-Mar-2023 Leeds Links updated and Harrogate Down siding added. GN
27-Mar-2023 Knottingley Links updated. GN
27-Mar-2023 Motherwell Minor corrections and G3 TD shunt signals added. GN
12-Feb-2023 ArunValley Ford camera added. GN
20-Mar-2023 Peterborough Marholm/Walton labels repositioned. GN
20-Mar-2023 Carlisle Upperby berth corrected. GN
20-Mar-2023 East Manchester Stalybridge layout updated. Missing signal Castleton East added. ELR North end detailed. GN
20-Mar-2023 Westhampstead Luton Dart added. GN
08-Mar-2023 Motherwell Carstairs area updated. GN
26-Feb-2023 Teesside East end of Tees yard alterations. GN
25-Feb-2023 Derby Uttoxeter line improved. GN
12-Feb-2023 Cornwall Kernow Models icon added. GN
13-Feb-2023 Woking Hook bank slip alterations removed as repair work completed and layout being returned to normal. GN
06-Feb-2023 Cornwall St Blazey Up Siding removed. GN
06-Feb-2023 Birmingham Camp Hill line redrawn and under construction / proposed stations added. GN
27-Jan-2023 Worcester Section panel order revised. Signal position corrected Oddingley. GN
26-Jan-2023 Eastleigh Totton Fawley Loop routes codes corrected. GN
23-Jan-2023 Woking Temporary layout in Hook area because of bank slip rectification work. GN
20-Jan-2023 Worksop Links updated. Some non-reporting sections added from NorthLincs diagram. GN
20-Jan-2023 NorthLincs Converted to wide format and links updated. Some non-reporting sections transferred to Worksop diagram. Cleethorpes cameras added. GN
04-Jan-2023 Waterloo Minor corrections. GN
04-Jan-2023 SouthLondon Minor corrections. GN
03-Jan-2023 Barrow Arnside camera icon changed to blue. Other minor alterations. GN
03-Jan-2023 Workington St Bees camera greyed out. Other minor alterations. GN
02-Jan-2023 Knottingley Updated for Castleford alterations. Some redrawing to improve layout. GN
01-Jan-2023 Leeds Updated for Holbeck alterations. Some redrawing to improve layout. GN
01-Jan-2023 Key Updated with additional information. GN
01-Jan-2023 Waterloo Updated for new Victoria Central area (XA and XB) TDs. GN
01-Jan-2023 SouthLondon Updated for new Victoria Central area (XA and XB) TDs. GN
29-Dec-2022 Waterloo Updated for new Victoria Eastern area (X8) TD. GN
29-Dec-2022 Pennines Woolley Coal Sidings crossover and signal box added. GN
29-Dec-2022 Waterloo Updated for new Victoria Eastern area (X8) TD. GN
28-Dec-2022 Birmingham Soho and Kings Norton areas redrawn and missing signals added. GN
27-Dec-2022 Birmingham Many areas redrawn to improve layout. New Street TD (NS) alterations. GN
27-Dec-2022 Dorset Yeovil route corrections. GN
22-Dec-2022 Brighton Missing signals at Molescoomb added. GN
22-Dec-2022 Dorset Minor route gif corrections. GN
14-Dec-2022 Brighton Route coding for Lewes/Seaford/Eastbourne/Bexhill (X7 TD) area. GN
14-Dec-2022 Crossrail Minor corrections. GN
12-Dec-2022 Dorset Minor corrections. GN
12-Dec-2022 Eastleigh Minor corrections. GN
12-Dec-2022 Arun Valley Minor corrections. GN
06-Dec-2022 Dorset Links updated. Some redrawing and routes added for Poole to Wool and Gillingham to Pinhoe routes. GN
06-Dec-2022 Eastleigh Routes added Southampton to Totton. GN
06-Dec-2022 Glasgow Central Some route corrections. GN
06-Dec-2022 Arun Valley Horsham layout updated. Missing signals Barnham and Yapton added. Routes added in Barnham area. GN
06-Dec-2022 West London Waterloo LC removed as closed. GN
06-Dec-2022 Glasgow Central Some route corrections. GN
23-Nov-2022 March Kings Dyke LC removed as closed. GN
23-Nov-2022 Tyneside Jarrow branch doubling. GN
23-Nov-2022 Berwick Chathill mileage corrected. GN
22-Nov-2022 Glasgow Central Corrections to route coding. GN
22-Nov-2022 Merseyrail Corrections to mileages on New Brighton line. GN
22-Nov-2022 Fife New EE TD update (removing EA TD). Leven Branch updated. Gaelic station names and some mileages added. GN
16-Nov-2022 Glasgow Central Corrections to route coding. GN
14-Nov-2022 Tayside Greenloaning loops/crossover removed. GN
14-Nov-2022 Colchester Haughley Jn. to Bury St. Edmunds area updated/corrected. GN
14-Nov-2022 Glasgow Central Routes added. Minor corrections. GN
30-Oct-2022 Inverness Minor corrections. GN
30-Oct-2022 Far North Gaelic station names added. Minor corrections. GN
30-Oct-2022 Glasgow Central Barrhead updated and transfered from GSW diagram. Aspect feeds corrected. GN
23-Oct-2022 Aberdeen Updated for Inverness Airport routes. GN
23-Oct-2022 Inverness Inverness Airport and routes added. GN
23-Oct-2022 Far North Links updated. Inverness Airport and routes added. GN
23-Oct-2022 Rugby Blisworth missing signals added. GN
23-Oct-2022 Far North Links updated. Inverness Airport and routes added. GN
20-Oct-2022 Manchester East East Lancs Railway cameras added. GN
08-Oct-2022 Liverpool Street Some redrawing and aspects added to Q4 TD area. GN
05-Oct-2022 Euston Watford North Jn. crossover added. GN
26-Sept-2022 Manchester West Ashburys signal corrected. Metrolink layout corrections to St Peters Square and Piccadilly. GN
18-Sep-2022 Cornwall Scorrier camera added. GN
29-Aug-2022 Stoke Macclesfield signal / recontrol. GN
26-Aug-2022 Leeds Haworth South camera added. GN
25-Aug-2022 York Poppleton signalling updated. GN
19-Aug-2022 Cornwall Links updated. Saltash to Liskeard/Looe transferred to Plymouth diagram to match train describer area. GN
19-Aug-2022 Plymouth Converted to wide format and detail added. Links updated. Gunnislake branch added. Saltash to Liskeard/Looe transferred from Cornwall diagram to match train describer area. GN
19-Aug-2022 Exeter Minor alterations. GN
02-Aug-2022 Merseyrail Routes corrected. GN
30-Jul-2022 Merseyrail Routes corrected. GN
28-Jul-2022 Merseyrail Routes added. GN
14-Jul-2022 Liverpool Missing signals at Edge Hill. Some redrawing and detailing. GN
14-Jul-2022 Leicester Signal berth near Kettering corrected. GN
13-Jul-2022 Leeds New KWVR cameras added. Neville Hill / Church Fenton area repositioned. GN
09-Jul-2022 Leicester Missing UFL signals Irchester area added. Leicester North layout corrected. GN
07-Jul-2022 Tonbridge Inter-diagram link at Kemsing corrected. Other links updated. GN
03-Jul-2022 Sheffield Missing section north of Penistone towards Shepley added. GN
03-Jul-2022 Pennines Diggle loop berth corrected. Link to Sheffield diagram added at Shepley. GN
03-Jul-2022 Manchester East Diggle loop corrected GN
28-Jun-2022 Seaton Updated Colyford camera. GN
12-Jun-2022 Chilterns Updated links for Claydon diagram. GN
12-Jun-2022 Claydon New diagram for East West Rail route under construction. GN
12-Jun-2022 Bletchley Wolverton/Milton Keynes/Bletchley areas redrawn. GN
09-Jun-2022 Manchester South Programming/links updated. Manchester Metrolink routes updated. GN
09-Jun-2022 Manchester West Programming/links updated. Manchester Metrolink routes updated. GN
09-Jun-2022 Manchester East Baguley Fold SB abolition. Manchester Metrolink routes updated. GN
09-Jun-2022 Exeter Minor corrections GN
07-Jun-2022 Exeter Exeter TD routes added. GN
06-Jun-2022 Manchester East East Lancs Railway link corrected, GN
06-Jun-2022 Arun Valley Arundel station area corrected. GN
06-Jun-2022 Preston Missing crossover added at Fylde Jn. East Lancs line redrawn/detailed. GN
05-Jun-2022 Exeter Routes added for Exmouth Jn. area. GN
05-Jun-2022 Eastleigh Minor corrections and route information updated in connection with Exmouth Jn. area GN
01-Jun-2022 Exeter Signal aspects added for Exmouth Jn. area. GN
01-Jun-2022 Kings Cross Routes corrected in Royston area GN
01-Jun-2022 Exeter Signal aspects added for Exmouth Jn. area. GN
13-May-2022 Brighton Minor corrections and links updated. GN
13-May-2022 Arun Valley Minor corrections and links updated. GN
11-May-2022 Crossrail Route indications added. GN
10-May-2022 S&C Horton-in-Ribblesdale camera reinstated. GN
05-May-2022 Tyneside Missing Felling(T&W) station added. Other minor corrections. GN
01-May-2022 Skegness New diagram. Formally part of Worksop diagram. GN
01-May-2022 Worksop Converted to wide format / current formatting and partly redrawn. Skegness route split to to new diagram. GN
01-May-2022 Kings Cross Moorgate line signalling updated. TRTS added. Route indications corrected at Biggleswade, Hitchin and Welwyn Garden City. GN
21-Apr-2022 Crewe Down Chester Independent removed. GN
21-Apr-2022 LTSLines Updated for TD changes in Barking camera area. GN
20-Apr-2022 Euston Updated for Watford North Jn. reinstatement. GN
20-Apr-2022 West London Minor corrections. GN
19-Apr-2022 Woking Updated for Egham / Chertsey / Frimley / Bracknell area transferred to Basingstoke ROC. GN
15-Apr-2022 West London Updated for Egham / Chertsey / Frimley / Bracknell area transferred to Basingstoke ROC. GN
14-Apr-2022 Leeds ECML quick link panel added. Redrawing of Moorthorpe area. Additional missing berths added Church Fenton / Moorthorpe / South Kirby / Mickleield / Hickleton areas. GN
12-Apr-2022 Leeds Some redrawing of junctions west of Leeds station. Additional berths added in bays 7,10,13,14,17 at Leeds station. GN
01-Apr-2022 York Yards and Turntable area redrawn. ROC training centre added. Former location of York South cameras added for reference for people looking at old stills. GN
31-Mar-2022 Glasgow Central Missing Eglinton Street tunnels added. GN
30-Mar-2022 Euston Routes into platforms 3 an 4 at Euston corrected. Minor layout changes in Willesden area. GN
24-Mar-2022 S&C Garsdale cameras added and northern end of diagram updated. Some links updated. GN
15-Mar-2022 Severn Valley Bridgnorth camera relocation. Some links updated. GN
13-Mar-2022 Leeds Shipley area redrawn. GN
13-Mar-2022 Derby Uttoxeter line fringe updated. GN
13-Mar-2022 Stoke Uttoxeter line fringe updated. GN
05-Mar-2022 Epping New diagram for Epping camera. GN
02-Mar-2022 Stoke Platform numbering in Macclesfield area corrected. Uttoxeter line redrawn. GN
02-Mar-2022 EastKent Gillingham and Sheerness branch updated. Thanet Parkway station added. GN
28-Feb-2022 Guildford TRTS indications added to Portsmouth area. GN
27-Feb-2022 Edinburgh New stations added. GN
27-Feb-2022 Shrewsbury Minor corrections. GN
23-Feb-2022 WestWales Minor corrections. GN
23-Feb-2022 Westbury Minor corrections. GN
23-Feb-2022 Euston Some corrections to previous update. GN
21-Feb-2022 Euston Routes added Willesden to Watford on DC lines. Aspects added in Wembley Yard area. GN
18-Feb-2022 Euston Links updated. Routes added Euston to Queen's Park. GN
06-Feb-2022 Glasgow Central Platform 14 number corrected. GN
06-Feb-2022 Exeter New GWML diagram link section added. Marsh Barton station added. GN
06-Feb-2022 Thames Valley New GWML diagram link section added. Section Newbury to Westbury (excl.) redrawn / detailed. GN
06-Feb-2022 West Wales New GWML diagram link section added. GN
06-Feb-2022 Reading New GWML diagram link section added. GN
06-Feb-2022 Paddington New GWML diagram link section added. GN
06-Feb-2022 Port Talbot Links updated for new Central Wales diagram. GN
06-Feb-2022 Shrewsbury Links updated for new Central Wales diagram. GN
06-Feb-2022 Central Wales New diagram. GN
03-Feb-2022 Woking Links updated for new Reading diagram. GN
03-Feb-2022 West London Links updated for new Reading diagram. GN
03-Feb-2022 Thames Valley Links updated for new Reading diagram. GN
03-Feb-2022 Westbury Redrawn/detailed Theale to Newbury. Links updated for new Reading diagram. GN
03-Feb-2022 Reading New diagram split off from former Paddington diagram. GN
03-Feb-2022 Paddington Routes added for part D6 TD (Maidenhead area). Reading section split off to new diagram. GN
30-Jan-2022 Paddington Routes added for part D6 TD (Slough/Windsor areas). GN
24-Jan-2022 Paddington Corrections and routes added for part D4 TD (Hanwell/Heathrow). GN
16-Jan-2022 Paddington Parts redrawn and routes added for D3 and DA TDs (Paddington/Ealing/Greenford). GN
31-Dec-2021 Leeds Leeds platforms 4/5/6 layout alterations. GN
31-Dec-2021 Liverpool Missing section/stations Warrington/Liverpool fringe added. GN
31-Dec-2021 Warrington Missing section/stations Warrington/Liverpool fringe added. GN
31-Dec-2021 Peterborough Links updated. GN
27-Dec-2021 Snow Hill Kidderminster section updated and other minor corrections. GN
27-Dec-2021 Doncaster Barnby Dun added. GN
26-Dec-2021 Paddington TD updated for and alterations to Acton/Greenford route. GN
26-Dec-2021 Tyneside TDs updated. Some alterations to Sunderland route. GN
13-Dec-2021 Ely Diagram superseded by Cambridge and March diagram alterations. GN
13-Dec-2021 March Most of diagram redrawn/detailed and routes added. GN
13-Dec-2021 Cambridge Most of diagram redrawn/detailed and routes added. GN
13-Dec-2021 Colchester Most of diagram redrawn/detailed and routes added on Colchester/Walton/Clacton area. GN
07-Dec-2021 Doncaster Newark cameras updated. Loop lengths added. GN
07-Dec-2021 Exeter Dawlish cameras updated. Okehampton line added. Links updated. GN
05-Dec-2021 Peterborough Glinton Junction area corrected. Links updated. GN
05-Dec-2021 Woking Alresford and Andover Yard updated. Links updated. GN
02-Dec-2021 Motherwell Ravenstruther updated. Loop lengths added. GN
27-Nov-2021 Leeds Keighley camera added. Shipley and adjacent areas redrawn and missing signals added. HG TD routes added. GN
23-Nov-2021 Warrington Wigan cameras added. GN
17-Nov-2021 Teesside Minor corrections. GN
16-Nov-2021 Teesside YZ TD amended to YB TD. GN
14-Nov-2021 Teesside Amended for Middlesbrough area recontrol. GN
05-Nov-2021 EastYorks Bridlington platform numbering corrected as renumbering did not happen as expected. GN
01-Nov-2021 NorthYorks Links updated. GN
01-Nov-2021 EastYorks Bridlington area updated for layout change. Links updated. GN
01-Nov-2021 Preston Layout improved and Leyland cameras removed. GN
21-Oct-2021 Warrington Layout improved and other minor corrections. GN
21-Oct-2021 Sheffield Beighton area signalling corrected GN
18-Oct-2021 Warrington Routes from Wigan Wallgate to Kirkby and Southport added removing gap in coverage. GN
18-Oct-2021 Gloucester Missing crossover at Cheltenham added. Links updated and some additional information added. GN
09-Oct-2021 Key Some additional information added. GN
08-Oct-2021 Northwales Updated for Frodsham area alterations. Area west of Colwyn Bay detailed. Other minor corrections. GN
07-Oct-2021 Merseyside Updated for Frodsham area alterations. TDs updated for Liverpool main line sections. GN
07-Oct-2021 Stafford Minor corrections. GN
05-Oct-2021 Tayside Minor corrections. GN
05-Oct-2021 Euston Minor corrections. GN
05-Oct-2021 Liverpool Updated for Frodsham area alterations. GN
05-Oct-2021 Warrington Warrington/Earlestown/Newton-le-Willows areas redrawn. GN
04-Oct-2021 Warrington Frodsham area added after Norton SB abolished. GN
02-Oct-2021 Tayside Dundee area signals live. GN
02-Oct-2021 Euston Wembley Yard area details added. Watford camera PTZ. GN
02-Oct-2021 NorthLondon Partly redrawn, missing stations added on East London line, links updated. GN
01-Oct-2021 Guildford Signal numbers corrected Sandown, Smallbrook and Ryde areas. GN
28-Sep-2021 Birmingham Missing crossover at Birmingham International added. GN
23-Sep-2021 LTSLines Minor corrections. Routes added to east of Ripple Lane sidings. Level crossing details added. GN
21-Sep-2021 LTSLines Barking/Ripple Lane layout updated for Barking Riverside. Routes added to Ripple Lane yard area. GN
19-Sep-2021 Chilterns Links updated GN
14-Sep-2021 WestWales New diagram covering Llanelli to Fishguard/Pembroke Dock/Milford Haven. GN
13-Sep-2021 Crewe Signals corrected at Middlewich. Inter-diagram links updated. GN
12-Sep-2021 Birmingham Missing signal at Marston Green added. GN
11-Sep-2021 Stafford Stoke diagram link added at Colwich. Cannock Chase line redrawn. GN
11-Sep-2021 Tampere Links added. GN
07-Sep-2021 Tampere New diagram in connection with new Tampere camera. GN
30-Aug-2021 S&C Tyne Valley section transferred to new Tyne Valley diagram. GN
30-Aug-2021 Tyneside Tyne Valley link amended. GN
30-Aug-2021 Tyne Valley New diagram split off S&C diagram. GN
30-Aug-2021 Derby Stoke diagram link updated. GN
30-Aug-2021 Liverpool WCML quick diagram link panel added. GN
30-Aug-2021 Manchester West WCML quick diagram link panel added. Trafford Park area resignalling. GN
30-Aug-2021 Manchester South WCML quick diagram link panel added. Macclesfield/Stoke/Stone area transferred to new Stoke diagram. GN
30-Aug-2021 Stoke New diagram. Macclesfield/Stoke/Stone area transferred from Manchester South diagram and detailed. GN
30-Aug-2021 Walsall Diagram removed. Area transferred to Wolverhampton and Stafford diagrams. GN
30-Aug-2021 Wolverhampton WCML quick diagram link panel added. Most of Walsall diagram added. GN
30-Aug-2021 Birmingham WCML quick diagram link panel added. GN
30-Aug-2021 Glasgow Central WCML quick diagram link panel added. GN
30-Aug-2021 Motherwell WCML quick diagram link panel added. GN
30-Aug-2021 Carlisle WCML quick diagram link panel added. GN
30-Aug-2021 Preston WCML quick diagram link panel added. GN
30-Aug-2021 Warrington WCML quick diagram link panel added. GN
30-Aug-2021 Crewe WCML quick diagram link panel added. GN
30-Aug-2021 Stafford WCML quick diagram link panel added. Cannock Chase line added from Walsall diagram. GN
30-Aug-2021 Rugby WCML quick diagram link panel added. GN
30-Aug-2021 Bletchley WCML quick diagram link panel added. GN
30-Aug-2021 Euston WCML quick diagram link panel added. GN
15-Aug-2021 Bristol Bristol Temple Meads and northern section of diagram updated for new layout and redrawn/detailed. GN
09-Aug-2021 Bristol St Philips Marsh depot area updated/corrected. Missing station links and some location links added. Diagram linking arrows amended. GN
09-Aug-2021 Woking Route corrected at Weybridge. Diagram linking arrows amended. GN
27-July-2021 Cambrian Updated for new camera at Tywyn plus some additional detailing. Links updated. GN
27-July-2021 Talyllyn New camera locations added. Signalling added on main line at Tywyn as a new camera covers that area. Links updated. GN
10-July-2021 Port Talbot Missing signal at Pontyclun added. Additional links and some detailing added. GN
27-June-2021 Motherwell Beattock PTZ added. Additional links and detailing added. GN
23-June-2021 Carlisle Carlisle area redrawn. Additional links and detailing added. GN
21-June-2021 S&C Converted to wide format. Links updated. Minor corrections and detailing to S&C route. GN
08-June-2021 Kings Cross Minor corrections. GN
05-June-2021 Seaton Stop boards added. Link updated GN
01-June-2021 Guildford Isle of Wight updated for upgrade alterations. GN
01-June-2021 East Kent Minor corrections. GN
01-June-2021 Glasgow Central Minor corrections. GN
30-May-2021 Glasgow Central Gifs and links updated. Some station platforms corrected, Ibrox Jn. added. Glasgow Central/Paisley areas redrawn. GN
20-May-2021 Seaton Gifs updated. GN
20-May-2021 Severn Valley Gifs updated. GN
20-May-2021 Crossrail Links updated. Some Crossrail signal berths updated. GN
20-May-2021 West Highland Glenfinnan camera removed. GN
20-May-2021 Paddington Links updated. Some Crossrail signal berths updated. Slough cameras removed. GN
17-May-2021 East Kent Some platform numbers corrected. Links updated. GN
09-May-2021 Aberdeen Links updated. ECML navigation pane added. GN
09-May-2021 Tayside Links updated. ECML navigation pane added. GN
09-May-2021 Fife Links updated. ECML navigation pane added. GN
09-May-2021 Edinburgh Links updated. ECML navigation pane added. GN
09-May-2021 Berwick Minor corrections. Links updated. ECML navigation pane added. GN
09-May-2021 Teesside Minor corrections. Links updated. ECML navigation pane added. GN
09-May-2021 York Links updated. Missing signal added from Eaglecliffe. ECML navigation pane added. GN
09-May-2021 Doncaster ECML navigation pane added. GN
09-May-2021 Peterborough Links updated. ECML navigation pane added. GN
09-May-2021 Kings Cross Routes added Alexandra Palace / Bowes Park. ECML navigation pane added. GN
06-May-2021 Kings Cross Routes added Harringay / Hornsey. GN
01-May-2021 Kings Cross Routes added Holloway / Finsbury Park / Moorgate. GN
27-Apr-2021 Kings Cross Routes added Kings Cross / Copenhagen Jn. GN
24-Apr-2021 Kings Cross Alexandra Palace / Finsbury Park / Kings Cross areas updated / redrawn for signalling recontrol to York ROC. GN
18-Apr-2021 Seaton Revised camera position. GN
16-Apr-2021 SevernValley Minor alterations. GN
16-Apr-2021 Leeds Missing shunt signals in Skipton/Keighley area added. GN
11-Apr-2021 SevernValley New diagram. GN
09-Apr-2021 Liverpool Street Platform 17 alterations. GN
08-Apr-2021 WestLondon Minor corrections. GN
08-Apr-2021 Waterloo Alterations in connection with Twickenham area recontrol to Basingstoke ROC. Links updated. GN
04-Apr-2021 WestLondon Twickenham area recontrol to Basingstoke ROC. Links updated. GN
15-Mar-2021 Seaton New diagram covering Seaton Tramway. GN
21-Mar-2021 Sheffield Beighton / Woodhouse / Woodburn recontrol to York ROC. GN
21-Mar-2021 Cardiff Penarth Curve North Jn. name corrected. Missing Welsh station names added. Links updated. GN
10-Mar-2021 Colchester Clacton Branch redrawn and altered for new layout at Clacton. Some detailing etc. Shenfield fringe to Manningtree. Links updated. GN
03-Mar-2021 Westhampstead Hendon Chord direction corrected. Missing signals added Brent Curve Jn. GN
27-Feb-2021 Kings Cross Amended to Y9 TD. GN
27-Feb-2021 Eastleigh St Denys to Southampton routes added. GN
20-Feb-2021 Carlisle Kingmoor area signals positions corrected. GN
19-Feb-2021 Eastleigh Eastleigh routes added. GN
16-Feb-2021 Eastleigh Micheldever to Shawford routes added. GN
13-Feb-2021 Eastleigh Southampton Maritime remodelling. GN
13-Feb-2021 Teesside Minor corrections. GN
09-Feb-2021 Teesside Minor corrections. GN
07-Feb-2021 Teesside Amended for Durham Coast recontrol to York ROC. GN
04-Feb-2021 FfestiniogWHR New diagram covering Porthmadog and Minffordd areas. To be extended later. GN
02-Feb-2021 Preston Minor corrections. GN
02-Feb-2021 Halifax Minor corrections. GN
30-Jan-2021 LTSLines Dagenham camera removed. GN
30-Jan-2021 Sheffield Further redrawing, corrections and detailing. GN
28-Jan-2021 Sheffield Some redrawing, corrections and detailing. Sheffield camera added. GN
25-Jan-2021 Crewe Minor corrections and detailing. GN
25-Jan-2021 GreatYarmouth Minor corrections. GN
24-Jan-2021 GreatYarmouth Saxmundham TD routes and aspects added. GN
19-Jan-2021 Ayrshire Minor correction, routes extended towards Glengarnock. GN
15-Jan-2021 Ayrshire Diagram redrawn into wide format. Links added/updated. Routes added Arkleston - Gourock/Wemyss Bay/Elderslie. GN
13-Jan-2021 Stranraer New diagram added. GN
06-Jan-2021 Kings Cross Links updated. Future Kings Cross layout added. GN
31-Dec-2020 Barrow In section berths added. GN
31-Dec-2020 Workington In section berths added. GN
30-Dec-2020 Peterborough Wrong direction berth added on Down Slow line Helpston/Tallington for Werrington engineering works. GN
29-Dec-2020 Leeds Platform 0 alterations completed. GN
26-Dec-2020 Carlisle Minor corrections and links updated. Converted to wide format diagram. GN
26-Dec-2020 Preston Links updated. GN
26-Dec-2020 Barrow New diagram covering south section of Cumbrian Coast line. GN
25-Dec-2020 Workington New diagram covering north section of Cumbrian Coast line GN
23-Dec-2020 Manchester South Minor corrections and links updated. GN
05-Nov-2020 Crewe Crewe camera 5 added. GN
25-Nov-2020 Berwick Links updated, layout improved and details added. GN
18-Nov-2020 Leeds Links updated and corrected. GN
18-Nov-2020 Doncaster Links updated and some areas moved as diagram now in wide format. GN
18-Nov-2020 Pennines Links updated and some minor corrections. Calder Bridge Jn / Crofton area redrawn. Huddersfield station corrected. Extended to meet Sheffield diagram at Barnsley link. GN
18-Nov-2020 Knottingley Links updated. Hensall camera added and line extended to meet EastYorks diagram at Goole link. GN
18-Nov-2020 LTS Lines Minor corrections. GN
09-Nov-2020 LTS Lines Routes completed. GN
31-Oct-2020 Guildford Ryde camera added. Station and adjacent diagram links updated. GN
24-Oct-2020 LTS Lines Routes added Upminster/Pitsea. Station and adjacent diagram links updated. GN
24-Oct-2020 Manchester East Vitriol Works crossover removed. Station and adjacent diagram links updated. GN
23-Oct-2020 Derby Breadsall corrected. Station and adjacent diagram links updated. GN
23-Oct-2020 Erewash Trent Jns. corrected. Station and adjacent diagram links updated. GN
23-Oct-2020 Leicester Wigston North Jn. crossover removed. Station and adjacent diagram links updated. GN
23-Oct-2020 Great Yarmouth Station and adjacent diagram links updated. GN
23-Oct-2020 Hereford Station and adjacent diagram links updated. GN
23-Oct-2020 Shrewsbury Station and adjacent diagram links updated. GN
23-Oct-2020 Wrexham Caergwrle station added. Station and adjacent diagram links updated. GN
22-Oct-2020 Woking Southcote Jn. link corrected. Station and adjacent diagram links updated. GN
09-Oct-2020 LTS Lines Routes extended to Upminster (excl.) GN
07-Oct-2020 LTS Lines Routes extended to Barking (excl.) GN
04-Oct-2020 Derby Derby North Jn. and Chaddesden sidings amended. GN
03-Oct-2020 Derby Cameras added. GN
01-Oct-2020 LTS Lines Minor corrections and some routes added. GN
27-Sep-2020 LTS Lines Updated for Q5 and Q6 TDs. GN
27-Sep-2020 Liverpool Street Updated for Q4 TD. GN
13-Sep-2020 Berwick Converted to wide format and Tyne & Wear Metro added. GN
13-Sep-2020 Tyneside Tyne & Wear Metro coverage extended and other areas checked and updated. GN
10-Sep-2020 Tyneside Newcastle area redrawn. GN
07-Sep-2020 Banbury Reservoir sidings layout corrected. GN
06-Sep-2020 Birmingham Coventry layout corrected. Some minor corrections. Junction links added. GN
05-Sep-2020 Bristol Minor corrections. GN
03-Sep-2020 Liverpool Ditton area recontrol to ROC alterations. Junction links added. GN
03-Sep-2020 Euston Minor corrections. GN
30-Aug-2020 Rugby Minor corrections. GN
30-Aug-2020 Bletchley Minor corrections. GN
30-Aug-2020 Chilterns Minor corrections. GN
30-Aug-2020 Banbury Minor corrections. GN
27-Aug-2020 Hope Valley Minor correction and adjacent diagram links updated. GN
27-Aug-2020 Sheffield Adjacent diagram links updated. GN
27-Aug-2020 Derby Adjacent diagram links updated. GN
27-Aug-2020 Leicester Adjacent diagram links updated. GN
27-Aug-2020 WestHampstead Adjacent diagram links updated. GN
27-Aug-2020 Manchester East Minor corrections and adjacent diagram links updated. GN
27-Aug-2020 Manchester East Minor corrections and adjacent diagram links updated. GN
27-Aug-2020 Stafford Converted to wide format. Minor corrections and adjacent diagram links updated. GN
27-Aug-2020 Rugby Combined with former Nuneaton diagram and south end of diagram transferred to new Bletchley diagram. Some redrawing ato cover R2 TD area nd adjacent diagram links updated. GN
27-Aug-2020 Bletchley New diagram covering R1 TD area (north end of Euston diagram and south end of Rugby diagram. GN
27-Aug-2020 Euston North end R1 TD area transferred to new Bletchley diagram and adjacent diagram links updated. GN
27-Aug-2020 Thames Valley Minor corrections and adjacent diagram links updated. GN
27-Aug-2020 Chilterns Diagram redrawn and update to incorporate CPRR line and camera. Aynho Jn. northwards section transferred to new Banbury diagram. GN
27-Aug-2020 Banbury New diagram covering north end of former Chilterns diagram. GN
27-Aug-2020 Snow Hill Minor corrections and adjacent diagram links updated. GN
27-Aug-2020 Birmingham Minor corrections and adjacent diagram links updated. GN
09-Aug-2020 Leeds & West Yorks Apperley Bridge camera added. Junction links added. GN
08-Aug-2020 Woking Woking station platform gif corrected. GN
03-Aug-2020 Tonbridge Station links for Chislehurst and Petts Wood corrected. Programming updated and junction links added. GN
03-Aug-2020 SoutheastLondon Minor corrections to signal berths altered during recontrol. GN
03-Aug-2020 Yoker Finnieston East Jn. corrected. GN
30-Jul-2020 SoutheastLondon Hither Green area recontrol update. GN
30-Jul-2020 Peterborough Note re Peterborough cameras removed. GN
24-Jul-2020 LTSLines Barking Riverside extension progress added. Minor amendments to Purfleet area. GN
21-Jul-2020 Guildford Links for IoWSR updated. GN
19-Jul-2020 Yoker Minor corrections. GN
17-Jul-2020 Yoker Converted to wide format and detailing added. Missing signals added and updated diagram and location links. GN
17-Jul-2020 West Hampstead Updated diagram and location links. GN
15-Jul-2020 West Highland Dalmuir camera icon removed. Updated location links. GN
13-Jul-2020 Teesside Updated station and location links. GN
13-Jul-2020 Woking Updated station and location links. GN
13-Jul-2020 Cambrian Updated station and location links. GN
13-Jul-2020 Aberdeen Updated station and location links. GN
07-Jul-2020 West Anglia Angel Road station shown as closed. Some other minor alterations. GN
07-Jul-2020 Liverpool Street Junction added at Lea Bridge. Link at Stratford Jubilee Line corrected. Some other minor alterations. GN
16-Jun-2020 Peterborough Peterborough cameras updated. Links added at non-station locations. GN
11-Jun-2020 Preston Leyland 2 camera added. Minor corrections. GN
10-Jun-2020 Hope Valley New diagram added GN
07-Jun-2020 Manchester South Links added at junctions. Bi-directional signalling added in Holmes Chapel / Chelford area. Section west of Altrincham drawn. GN
07-Jun-2020 Crewe Links added at junctions. Bi-directional signalling added in Sandbach area GN
04-Jun-2020 Guildford Links added at junctions. GN
04-Jun-2020 Leicester Signal 6065 at Wellingborough corrected. Links added at jucntions. GN
31-May-2020 Leeds Leeds platform 1 alteration GN
31-May-2020 Pennines Various correction and links updated GN
05-May-2020 Ely Redrawn in wide format and details added. GN
05-May-2020 March Detailed and extended towards Norwich at Ely North Jn. GN
04-May-2020 Peterborough Minor corrections. GN
04-May-2020 Derby LNWR Jn. layout corrected. GN
20-Apr-2020 Cambrian Redrawn in wide format and Dovey Junction camera added. GN
14-Apr-2020 York York South camera removed. GN
11-Apr-2020 Peterborough Redrawn in wide format. Werrington diveunder added. Various details added and minor corrections. GN
11-Apr-2020 March Initial drawing of new diagram added to fill diagram gap between Peterborough and Ely areas. GN
11-Apr-2020 Information Basic key information explaining diagrams. GN
30-Mar-2020 Derby Missing signals in Stenson Jn area added. GN
26-Mar-2020 Crewe Minor corrections. GN
26-Mar-2020 Leicester Missing signals in Loughborough/Syston area added. GN
22-Mar-2020 Crewe Crewe area redrawn. Converted to wide format. GN
20-Mar-2020 Erewash Attenborough station link corrected. GN
18-Mar-2020 Euston Watford Jn. to Camden redrawn. GN
13-Mar-2020 Euston Camden/Euston section redrawn. Converted to wide format. GN
04-Mar-2020 Woking Minor corrections to route coding. GN
04-Mar-2020 Waterloo Long standing issue with SU TD resolved allowing area to be live again and routes added for that area. GN
04-Mar-2020 Aberdeen and Inverness Route coding updated and split on diagrams now between Insch and Inverurie to improve overall size. GN
03-Mar-2020 West Manchester Signal corrected at Walkden. GN
01-Mar-2020 Rugby Transferred to wide format diagram. Bedford line removed as now on West Hampstead diagram. Some minor corrections/detailing. GN
28-Feb-2020 Norwich and Colchester East Suffolk line moved to Great Yarmouth diagram, Updates to fringes with Great Yarmouth diagram GN
28-Feb-2020 Great Yarmouth East Suffolk line transferred from Norwich/Colchester diagrams. Minor route coding corrections, Note re aspects reversed added. GN
27-Feb-2020 West Hampstead New signal section added on Bletchley line (installation date unknown) GN
19-Feb-2020 Eastleigh Missing signal added at Wilton Jn., Crossover added at East Grimstead, Some redrawing of Southampton area to improve layout. GN
18-Feb-2020 Liverpool Converted to wide format. Signal added at Runcorn. Sutton Weaver crossover added. Route Frodsham / Runcorn East added to link with Warrington, Crewe and Merseyrail diagrams. GN
16-Feb-2020 Guildford Minor route coding corrections GN
10-Feb-2020 Euston Converted to wide format. Layout/signals updated Wembley Central and Euston (HS2 works). St Albans Abbey branch added. GN
09-Feb-2020 Great Yarmouth Routes added GN
07-Feb-2020 Norwich Minor amendments and links updated GN
07-Feb-2020 Colchester Minor amendments and links updated GN
07-Feb-2020 Great Yarmouth New diagram covering Brundall to Great Yarmouth and Lowestoft GN
17-Jan-2020 Guildford Routes added in Havant / Portsmouth area plus minor amendments GN
16-Jan-2020 Thames Valley Minor redrawing and corrections GN
05-Jan-2020 West Hampstead Minor corrections GN
05-Jan-2020 Dorset Wool/Wareham/Poole - signal aspects added and general updates MR
04-Jan-2020 Warrington Springs Branch depot and Ashton in Makerfield added MR
04-Jan-2020 Leicester Wellingborough / Sharnbrook 4 tracking GN
03-Jan-2020 West Hampstead Wellingborough / Sharnbrook 4 tracking. Bletchley line added to diagram GN
03-Jan-2020 Dorset Brockenhurst/Bournemouth/Dorchester - signal aspects added MR
02-Jan-2020 Warrington Warrington West added and minor corrections GN
01-Jan-2020 Motherwell Minor corrections GN
25-Dec-2019 Motherwell Recontrol of Carstairs and WCML south area GN
24-Dec-2019 West Hampstead 4 tracking north of Sharnbrook added, St Pancras area extended to Belle Isle, other redrawing of area and detailing added GN
23-Dec-2019 Berwick Morpeth/Widdrington area - signal aspects added MR
9-Dec-2019 Edinburgh Dunbar platform 2 added, Edinburgh 5/6 extended to be geographically accurate, Oakbank viaduct name corrected GN
6-Dec-2019 Brighton Lewes/Eastbourne area resignalling GN
25-Oct-2019 Exeter Dawlish Warren camera added plus some minor detailing/gif updates GN
24-Oct-2019 Teesside Missing crossover at Middlesbrough added GN
24-Oct-2019 Leicester Spelling of Frisby corrected GN
12-Oct-2019 Newport West end of C1 TD area transferred from Cardiff diagram. Altered to wide format and some detailing added GN
12-Oct-2019 Cardiff West end of Cardiff area redrawn and corrected. Some redrawing of lower Valleys area. East end of diagram (C1 TD) transferred to Newport diagram GN
10-Oct-2019 Leeds Extended to Dewsbury (Y2 TD) ex Pennines diagram GN
09-Oct-2019 Cardiff East end of Cardiff area corrected GN
25-Sep-2019 Wolverhampton Missing signals / points added. Link to Shrewsbury added GN
19-Sep-2019 Tayside Highland Spring siding added at Blackford and amended links to new Inverness diagram GN
19-Sep-2019 Far North Updated coding and amended links to new Inverness diagram GN
19-Sep-2019 Aberdeen Area west of Inverurie transferred to new Inverness diagram GN
19-Sep-2019 Inverness New diagram to replace Highland Main line diagram after combining with route to Aberdeen to put all routes controlled from new work station at Inverness GN
17-Sep-2019 Woking Routes completed GN
03-Sep-2019 Erewash Chesterfield cameras and missing signal added GN
01-Sep-2019 Woking Redraw and route adding started GN
17-Aug-2019 Aberdeen Minor corrections. Keith and Dufftown railway route added. GN
16-Aug-2019 Aberdeen Routes added where available. GN
12-Aug-2019 Aberdeen Aberdeen - Dyce - Inverurie updated for doubling/resignalling. GN
08-Aug-2019 Colchester Minor corrections. GN
08-Aug-2019 Norwich Felixstowe branch updated (also covered by Colchester diagram). GN
01-July-2019 York Updated with ROC cameras. GN
21-July-2019 Manchester West Metrolink tram route updated. Trafford Park freight terminal area corrected layout. GN
18-July-2019 Worcester Diagram completed. GN
18-July-2019 Birmingham Bromsgrove/Worcester (BG TD) area transferred to Worcester diagram. GN
18-July-2019 Gloucester Link to Worcester diagram amended. GN
18-July-2019 Snow Hill Link to Worcester diagram amended. GN
14-July-2019 Birmingham Link added to Worcester diagram, some minor corrections. GN
13-July-2019 Worcester New diagram added. Ledbury to Worcestershire Parkway. Further extensions to be added later. GN
13-July-2019 Hereford Link added to Worcester diagram, level crossing details added. GN
13-July-2019 Thames Valley Oxford area redrawn and updated with 'wrong' direction signals. GN
11-July-2019 Thames Valley Swindon area redrawn and updated with 'wrong' direction signals. GN
04-July-2019 Thames Valley Didcot area redrawn and route to Bourton updated with 'wrong' direction signals. GN
04-July-2019 Paddington Link at Southcote Jn. updated for Newbury. GN
03-July-2019 Thames Valley 'Berks and Hants' route moved to Westbury. Westerleigh Jn. section moved to Bristol diagram. D2 and D9 TDs removed. GN
03-July-2019 Woking Link at Southcote Jn. updated for Newbury. GN
03-July-2019 Westbury 'Berks' and Hants' route added from Thames Valley diagram. D2 TD added. GN
03-July-2019 Bristol Westerleigh Jn. section added from Gloucester diagram. Some signals (and WW TD) at Bradford-on-Avon removed as duplicated on Westbury diagram. GN
03-July-2019 Gloucester Link to Bristol amended. GN
23-June-2019 West London Shepperton Line resignalling. Routes added Barnes area. GN
23-June-2019 Waterloo Shepperton Line resignalling. Routes added Earlsfield / East Putney to New Malden / Chessington South / Leatherhead. GN
14-June-2019 Leicester Some berths at East Midlands Parkway fringe transferred to Erewash to match train describer feeds. Market Harborough area updated. Syston / Melton Mowbray/ Manton Jn. / Stamford area updated / added to link to Peterborough diagram. GN
11-June-2019 Erewash East Midlands Freight terminal added. Some berths at East Midlands Parkway fringe transferred from Leicester to match train describer feeds GN
08-June-2019 Shrewsbury Camera position added and some minor amendments made GN
05-June-2019 Doncaster Converted to wider format. Doncaster station area partially redrawn corrected and camera position added GN
30-May-2019 Leeds and West Yorks Minor corrections GN
23-May-2019 Leeds and West Yorks Converted to wider format. Missing signal added at Shipley, missing signals added around Engine Shed Jn. area. Some redrawing of various area and Stourton area reversed. Harrogate line extended to link up with York diagram GN
20-May-2019 York two missing berth added in Dringhouses/Holgate area, Link to Leeds diagram (Harrogate line added at Poppleton GN
22-April-2019 Southeast London Recontrol of Angerstein area and some other minor amendments/corrections GN
06-April-2019 Bristol Bi-directional working added Bath area and Highbridge Loop GN
01-April-2019 Fife Signals updated Falkirk Grahamston area. Methil line and Fife Heritage Railway added (Cupar crossover removed from diagram 6 April) GN
27-Mar-2019 Highland Main Line Routes added GN
26-Mar-2019 ManchesterWest Missing signals added for reversible working Eccles/Ordsall Lane GN
25-Mar-2019 Highland Main Line New signalling in Pitlochry and Kincraig / Moy areas GN
25-Mar-2019 West Anglia level crossings added; third running line added between Coppermill Jn and Meridian Water MR
16-Mar-2019 Crossrail1 New diagram. Waiting for feed to be made live when line opens GN
11-Mar-2019 Teesside Bowesfield recontrol GN
11-Mar-2019 West Anglia area now controlled from Romford - signal aspects added MR
16-Feb-2019 South London Peckham Rye platforms 1/2 corrected GN
13-Feb-2019 Southeast London Lewisham / Hayes signalling recontrol GN
08-Feb-2019 Cornwall Detailing added and some minor corrections made GN
01-Feb-2019 Cornwall Looe Branch added and programming/gifs updated GN
01-Feb-2019 Exeter Errors at Newton Abbot and Exeter St Thomas corrected and programming/gifs updated GN
30-Jan-2019 Wrexham New diagram GN
28-Jan-2019 Hereford New diagram GN
28-Jan-2019 Shrewsbury New diagram GN
20-Jan-2019 Woking Link to Paddington at Southcote Jn amended, wrongly positioned gif at Hinchley Wood corrected GN
20-Jan-2019 Teesside Billingham LC road corrected GN
10-Jan-2019 HighlandMainLine Signal corrected at Stanley Jn, spurious platform at Culloden removed, Link to Ladybank corrected GN
06-Jan-2019 York Signal at Low Gates corrected GN
19-Jan-2019 Liverpool Street almost 100 new signal aspects added between Stratford and Romford, including the Temple Mills and Woodgrange Park areas MR
12-Jan-2019 Edinburgh new bay platforms 5+6 at Waverley added; signal aspects at Millerhill and Tweedbank added MR
03-Jan-2019 Liverpool Wavertree resignalling (Allerton/Speke 'boxes abolished) including the addition of signal aspects in the resignalled area MR
29-Dec-2018 Leeds Converted to wide format diagram and Church Fenton area transferred from York diagram GN
29-Dec-2018 York Church Fenton area (Y2 TD) transferred to Leeds diagram to avoid need for Y2 TD on diagram GN
28-Dec-2018 East Yorks Selby area transferred to York diagram GN
28-Dec-2018 York Selby area transferred from EastYorks diagram GN
26-Dec-2018 York Updated for recontrol to ROC Y1 TD GN
09-Dec-2018 Tayside Signal identity at Invergowrie corrected. Programming/gifs and some detailing updated GN
02-Dec-2018 LTS Lines Updated with Underground lines etc, Dagenham camera and converted to wide format GN
29-Nov-2018 WestSomerset Williton cameras added GN
28-Nov-2018 EastYorks Minor corrections and detailing GN
25-Nov-2018 Tyneside Hartlepool area transferred to Teesside diagram. Converted to wide format and some missing signals added. GN
23-Nov-2018 Teesside Hartlepool area transferred from Tyneside diagram GN
22-Nov-2018 Arun Valley Missing signal at Barnham added. Signal aspects added to Barnham station area GN
19-Nov-2018 EastYorks Updated for Gilberdyke/Hessle resignalling GN
05-Nov-2018 Whitby New diagram covering Nunthorpe / Pickering to Whitby GN
05-Nov-2018 Teesside Diagram completed to Saltburn etc. GN
30-Oct-2018 York Redrawn in wide format and new cameras added at Dringhouses. Eaglescliffe area moved to Teesside diagram GN
30-Oct-2018 Teesside Initial new diagram transferring Eaglescliffe area from York ECML diagram GN
30-Oct-2018 Tyneside Links (to Teesside diagram) changed GN
05-Oct-2018 Liverpool Street Alterations for Crossrail in Bow and Gidea Park areas. Rearrangement of sections to improve layout GN
09-Sep-2018 Glasgow Central Minor corrections and redrawing of Muirhouse Junctions / Cathcart Circle area GN
01-Sep-2018 Motherwell Final updating/detailing of Motherwell/Holytown and Wishaw/Law Junction/Shotts GN
30-Aug-2018 Motherwell Signal aspects added to the resignalled lines between Motherwell/Holytown and Wishaw/Law Junction/Shotts MR
20-Aug-2018 Aberdeen Kittybrewster - Dyce redoubling. Waiting for train reporting to be livened up for Dye area. GN
01-Aug-2018 Glasgow Central Polmadie and Rutherglen area alterations and resignalling. GN
01-Aug-2018 Motherwell Minor changes to berths in connection with Rutherglen alterations on Glasgow Central diagram GN
30-Jul-2018 Liverpool Lime Street resignalling (Lime Street 'box abolished) including the addition of signal aspects in the resignalled area MR
23-Jul-2018 Thames Valley Oxford remodelling + resignalling (Oxford PSB abolished) including the addition of signal aspects in the resignalled area MR
01-Jun-2018 Manchester East Minor corrections/updates to recently redrawn area. Stalybridge / Guide Bridge and area to south and east of diagram redrawn and detailed (minor corrections made 03-Jun-2018) GN
30-May-2018 Merseyrail Maghull North station updated, some minor redrawing and diagram extended to Helsby (non-reporting area) to extend diagram coverage GN
14-May-2018 Manchester East Signal aspects added to recently resignalled Ashton Moss and Denton Junction areas MR
09-May-2018 Liverpool Runcorn resignalling (Runcorn and Halton Junction 'boxes abolished) including signal aspects on the resignalled section MR
30-Apr-2018 Manchester East Miles Platting / Stalybridge resignalling and East Lancs Railway and Metrolink lines in area added GN
24-Apr-2018 Plymouth extra signal 'sections' in the Menheniot area commissioned this week MR
10-Apr-2018 Motherwell Signal aspects added to recently resignalled Coatbridge/Mossend/Holytown areas; broken aspects in Motherwell/Carstairs areas fixed MR
07-Apr-2018 Nottingham Missing signals added Beeston / Mansfield Jn and Netherfield / Radcliffe GN
04-Apr-2018 Bristol Bristol TM resignalling (Nailsea to Keynsham/Narroways) including extra 'mid platform' berths at Temple Meads MR
04-Apr-2018 Crewe Chester area removed (Chester can now be found on the new 'North Wales' diagram) MR
02-Apr-2018 Waterloo Resignalling of Sutton and Wimbledon areas (minor corrections made 03-Apr-2018 once signalling live) GN
02-Apr-2018 South London Resignalling of Sutton and Wimbledon areas. Aspects being added where available. (minor corrections made 03-Apr-2018 once signalling live) GN
01-Apr-2018 Motherwell Resignalling of Mossend and Coatbridge areas (minor corrections made 04-Apr-2018 once signalling live) GN
27-Mar-2018 North Wales Chester area added (and amended) from Crewe diagram prior to transfer from that diagram GN
26-Mar-2018 North Wales Shotton - Colwyn Bay signalling amended GN
01-Mar-2018 Leicester Signal aspects added to recently resignalled Kettering/Corby/Wigston areas MR
27-Feb-2018 Leicester Some detailing of Melton Mowbray / Oakham / Corby area. Bi-directional signals added Market Harborough / Kilby Bridge. Line details shown west of Stud Farm to link up with Derby diagram. GN
25-Feb-2018 Leicester Reinstatement of double track Kettering / Corby and resignalling control Sharnbrook / Wigston area. Initial main alterations only to ensure diagram continued working for train tracking. Further work in progress. GN
25-Feb-2018 SouthLondon Spa Valley Railway and Groombridge camera added. Realignment of Herne Hill / Peckham Rye area to eliminate break in line. GN
12-Feb-2018 Pennines Corrected issues arising from reformatting / area changes. MR
12-Feb-2018 Stirling Added signal aspects. TA
08-Feb-2018 WestLondon Various long standing minor errors corrected. Acton Wells Jn and Strawberry Hill areas redrawn to improve layout. Aspects now displayed where available. GN
06-Feb-2018 ManchesterWest missing signal aspects on Ordsall Chord added; 'stuck' berths at Manchester Victoria fixed MR
05-Feb-2018 Gloucester Link to Thames Valley corrected. Some detailing added GN
05-Feb-2018 SoutheastLondon Line directions corrected and notations added North Kent East Jn area GN
31-Jan-2018 Motherwell Signal aspects added / corrected GN
26-Jan-2018 Edinburgh Further details added GN
25-Jan-2018 HighlandMainLine / Tayside / GlasgowQS / Motherwell Links to adjoining diagrams (Edinburgh /Fife) updated GN
24-Jan-2018 Fife New diagram replacing former Cupar - Haymarket diagram after part transferred to Edinburgh diagram GN
24-Jan-2018 Worksop-Lincoln signal aspects added to Lincoln area MR
24-Jan-2018 Rugby non functioning signal aspects in the Rugby and Northampton areas fixed MR
24-Jan-2018 Chilterns missing crossover at Leamington Spa (Foundry Wood Junction) added MR
23-Jan-2018 Cambridge non functioning signal aspects between Cambridge and Audley End fixed MR
23-Jan-2018 Rugby missing 97xx aspects at Milton Keynes Central station added MR
23-Jan-2018 Newport over 30 signal aspects added/corrected MR
23-Jan-2018 Ely signal aspects added/corrected at Bury St.Edmunds MR
22-Jan-2018 Pennines Re-signalling around Huddersfield etc. Control to York ROC. Aspects added TM
22-Jan-2018 Southeast London Alterations correcting a few gif errors. Signal 2243 TD amended from X2 to X3. Crossover at Bermondsey flyover corrected, missing signal at Bermondsey added and minor redrawing of this area to improve general look. Some detailing of line names and directions added. GN
22-Jan-2018 South London Streatham South Junction crossover corrected. Junction layouts at Tulse Hill and Loughborough Junction corrected. Elephant & Castle station and immediate vicinity lines removed (duplicated with later SouthEastLondon diagram). GN
22-Jan-2018 Edinburgh Haymarket area and sections west of station on EB TD transferred from Cupar diagram (will be removed from there later but at present duplicated). Platform extensions (5, 6and 12) at Waverley added. Millerhill depot and associated signalling added. Missing signals at Gransthouse added, ECML LCs added. A lot more detailing still to do. GN
21-Jan-2018 Chilterns Oxford Parkway area signal aspects corrected; Aynho Junction berth 4763 signal aspect added ; Leamington station signal aspects corrected MR
18-Jan-2018 Nottingham missing aspects in the Beeston area added MR
17-Jan-2018 Paddington Twyford area signal aspects corrected MR
16-Jan-2018 Sheffield Sheffield station signal aspects corrected MR
16-Jan-2018 Stafford Colwich area signal aspects corrected MR
02-Jan-2018 Southeast London Re-signalling of London Bridge area, Kidbrooke crossover removed GN
31-Dec-2017 Paddington Tidy-up and detailing GN
29-Dec-2017 Birmingham Corrected errors TM
24-Dec-2017 Birmingham Re-signalling of Perry Barr to Aston / Soho / Tipton TM
27-Dec-2017 Manchester West Market Street platform on Metrolink corrected. GN
27-Dec-2017 Highland ML Pitlochry alteration GN
27-Dec-2017 Paddington Re-signalling of Paddington area (Crossrail) GN
27-Dec-2017 Glasgow QS Re-signalling of Carmuirs area TA
26-Dec-2017 Cupar Re-signalling of Carmuirs area TA
24-Dec-2017 Brighton Revised Redhill layout GN
24-Dec-2017 - change log started -