Recent Changes

From Railcam Support
Revision as of 21:38, 24 January 2018 by Freightmaster (Talk | contribs)

Jump to: navigation, search
Diagram Changes - IN-PROGRESS
Diagram Notes Editor
Birmingham further adjustments TM
Diagram Changes - LIVE
Live Date Diagram Notes Editor
24-Jan-2017 Worksop-Lincoln signal aspects added to Lincoln area MR
24-Jan-2017 Rugby non functioning signal aspects in the Rugby and Northampton areas fixed MR
24-Jan-2017 Chilterns missing crossover at Leamington Spa (Foundry Wood Junction) added MR
23-Jan-2017 Cambridge non functioning signal aspects between Cambridge and Audley End fixed MR
23-Jan-2017 Rugby missing 97xx aspects at Milton Keynes Central station added MR
23-Jan-2017 Newport over 30 signal aspects added/corrected MR
23-Jan-2017 Ely signal aspects added/corrected at Bury St.Edmunds MR
22-Jan-2018 Pennines Re-signalling around Huddersfield etc. Control to York ROC. Aspects added TM
22-Jan-2018 Southeast London Alterations correcting a few gif errors. Signal 2243 TD amended from X2 to X3. Crossover at Bermondsey flyover corrected, missing signal at Bermondsey added and minor redrawing of this area to improve general look. Some detailing of line names and directions added. GN
22-Jan-2018 South London Streatham South Junction crossover corrected. Junction layouts at Tulse Hill and Loughborough Junction corrected. Elephant & Castle station and immediate vicinity lines removed (duplicated with later SouthEastLondon diagram). GN
22-Jan-2018 Edinburgh Haymarket area and sections west of station on EB TD transferred from Cupar diagram (will be removed from there later but at present duplicated). Platform extensions (5, 6and 12) at Waverley added. Millerhill depot and associated signalling added. Missing signals at Gransthouse added, ECML LCs added. A lot more detailing still to do. GN
21-Jan-2017 Chilterns Oxford Parkway area signal aspects corrected; Aynho Junction berth 4763 signal aspect added ; Leamington station signal aspects corrected MR
18-Jan-2017 Nottingham missing aspects in the Beeston area added MR
17-Jan-2017 Paddington Twyford area signal aspects corrected MR
16-Jan-2017 Sheffield Sheffield station signal aspects corrected MR
16-Jan-2017 Stafford Colwich area signal aspects corrected MR
02-Jan-2018 Southeast London Re-signalling of London Bridge area, Kidbrooke crossover removed GN
31-Dec-2017 Paddington Tidy-up and detailing GN
29-Dec-2017 Birmingham Corrected errors TM
24-Dec-2017 Birmingham Re-signalling of Perry Barr to Aston / Soho / Tipton TM
27-Dec-2017 Manchester West Market Street platform on Metrolink corrected. GN
27-Dec-2017 Highland ML Pitlochry alteration GN
27-Dec-2017 Paddington Re-signalling of Paddington area (Crossrail) GN
27-Dec-2017 Glasgow QS Re-signalling of Carmuirs area TA
26-Dec-2017 Cupar Re-signalling of Carmuirs area TA
24-Dec-2017 Brighton Revised Redhill layout GN
24-Dec-2017 - change log started -