Difference between revisions of "Recent Changes"

From Railcam Support
Jump to: navigation, search
Line 16: Line 16:
 
! scope="col" | Notes
 
! scope="col" | Notes
 
! scope="col" | Editor
 
! scope="col" | Editor
 +
|-
 +
| 12-Feb-2018 || Pennines || Corrected issues arising from reformatting / area changes. || MR
 +
|-
 +
| 12-Feb-2018 || Knottingly|| Corrected issues arising from reformatting / area changes. || MR
 +
|-
 +
| 12-Feb-2018 || Worksop|| SIgnal corrections. || TA
 +
|-
 +
| 12-Feb-2018 || Stirling|| Added signal aspects. || TA
 
|-
 
|-
 
| 08-Feb-2018 || WestLondon || Various long standing minor errors corrected. Acton Wells Jn and Strawberry Hill areas redrawn to improve layout. Aspects now displayed where available. || GN
 
| 08-Feb-2018 || WestLondon || Various long standing minor errors corrected. Acton Wells Jn and Strawberry Hill areas redrawn to improve layout. Aspects now displayed where available. || GN

Revision as of 09:53, 12 February 2018

Diagram Changes - IN-PROGRESS
Diagram Notes Editor
NorthWales Easter resignalling alterations GN
Birmingham further adjustments TM
Diagram Changes - LIVE
Live Date Diagram Notes Editor
12-Feb-2018 Pennines Corrected issues arising from reformatting / area changes. MR
12-Feb-2018 Knottingly Corrected issues arising from reformatting / area changes. MR
12-Feb-2018 Worksop SIgnal corrections. TA
12-Feb-2018 Stirling Added signal aspects. TA
08-Feb-2018 WestLondon Various long standing minor errors corrected. Acton Wells Jn and Strawberry Hill areas redrawn to improve layout. Aspects now displayed where available. GN
06-Feb-2018 ManchesterWest missing signal aspects on Ordsall Chord added; 'stuck' berths at Manchester Victoria fixed MR
05-Feb-2018 Gloucester Link to Thames Valley corrected. Some detailing added GN
05-Feb-2018 SoutheastLondon Line directions corrected and notations added North Kent East Jn area GN
31-Jan-2018 Motherwell Signal aspects added / corrected GN
26-Jan-2018 Edinburgh Further details added GN
25-Jan-2018 HighlandMainLine / Tayside / GlasgowQS / Motherwell Links to adjoining diagrams (Edinburgh /Fife) updated GN
24-Jan-2018 Fife New diagram replacing former Cupar - Haymarket diagram after part transferred to Edinburgh diagram GN
24-Jan-2018 Worksop-Lincoln signal aspects added to Lincoln area MR
24-Jan-2018 Rugby non functioning signal aspects in the Rugby and Northampton areas fixed MR
24-Jan-2018 Chilterns missing crossover at Leamington Spa (Foundry Wood Junction) added MR
23-Jan-2018 Cambridge non functioning signal aspects between Cambridge and Audley End fixed MR
23-Jan-2018 Rugby missing 97xx aspects at Milton Keynes Central station added MR
23-Jan-2018 Newport over 30 signal aspects added/corrected MR
23-Jan-2018 Ely signal aspects added/corrected at Bury St.Edmunds MR
22-Jan-2018 Pennines Re-signalling around Huddersfield etc. Control to York ROC. Aspects added TM
22-Jan-2018 Southeast London Alterations correcting a few gif errors. Signal 2243 TD amended from X2 to X3. Crossover at Bermondsey flyover corrected, missing signal at Bermondsey added and minor redrawing of this area to improve general look. Some detailing of line names and directions added. GN
22-Jan-2018 South London Streatham South Junction crossover corrected. Junction layouts at Tulse Hill and Loughborough Junction corrected. Elephant & Castle station and immediate vicinity lines removed (duplicated with later SouthEastLondon diagram). GN
22-Jan-2018 Edinburgh Haymarket area and sections west of station on EB TD transferred from Cupar diagram (will be removed from there later but at present duplicated). Platform extensions (5, 6and 12) at Waverley added. Millerhill depot and associated signalling added. Missing signals at Gransthouse added, ECML LCs added. A lot more detailing still to do. GN
21-Jan-2018 Chilterns Oxford Parkway area signal aspects corrected; Aynho Junction berth 4763 signal aspect added ; Leamington station signal aspects corrected MR
18-Jan-2018 Nottingham missing aspects in the Beeston area added MR
17-Jan-2018 Paddington Twyford area signal aspects corrected MR
16-Jan-2018 Sheffield Sheffield station signal aspects corrected MR
16-Jan-2018 Stafford Colwich area signal aspects corrected MR
02-Jan-2018 Southeast London Re-signalling of London Bridge area, Kidbrooke crossover removed GN
31-Dec-2017 Paddington Tidy-up and detailing GN
29-Dec-2017 Birmingham Corrected errors TM
24-Dec-2017 Birmingham Re-signalling of Perry Barr to Aston / Soho / Tipton TM
27-Dec-2017 Manchester West Market Street platform on Metrolink corrected. GN
27-Dec-2017 Highland ML Pitlochry alteration GN
27-Dec-2017 Paddington Re-signalling of Paddington area (Crossrail) GN
27-Dec-2017 Glasgow QS Re-signalling of Carmuirs area TA
26-Dec-2017 Cupar Re-signalling of Carmuirs area TA
24-Dec-2017 Brighton Revised Redhill layout GN
24-Dec-2017 - change log started -