Recent Changes

From Railcam Support
Revision as of 21:40, 30 October 2020 by LaSERman (Talk | contribs)

Jump to: navigation, search
}
Diagram Changes - IN-PROGRESS
Diagram Notes Editor
Eastleigh Alterations in Southampton/Redbridge area (Was planned 11th and 18th February 2019 but postponed UFN) GN
Teesside Recontrol Durham Coast (October 2020) GN
Colchester Clacton remodel (2021) GN
Diagram Changes - LIVE
Live Date Diagram Notes Editor
24-Oct-2020 LTS Lines Routes added Upminster/Pitsea. Station and adjacent diagram links updated. GN
24-Oct-2020 Manchester East Vitriol Works crossover removed. Station and adjacent diagram links updated. GN
23-Oct-2020 Derby Breadsall corrected. Station and adjacent diagram links updated. GN
23-Oct-2020 Erewash Trent Jns. corrected. Station and adjacent diagram links updated. GN
23-Oct-2020 Leicester Wigston North Jn. crossover removed. Station and adjacent diagram links updated. GN
23-Oct-2020 Great Yarmouth Station and adjacent diagram links updated. GN
23-Oct-2020 Hereford Station and adjacent diagram links updated. GN
23-Oct-2020 Shrewsbury Station and adjacent diagram links updated. GN
23-Oct-2020 Wrexham Caergwrle station added. Station and adjacent diagram links updated. GN
22-Oct-2020 Woking Southcote Jn. link corrected. Station and adjacent diagram links updated. GN
09-Oct-2020 LTS Lines Routes extended to Upminster (excl.) GN
07-Oct-2020 LTS Lines Routes extended to Barking (excl.) GN
04-Oct-2020 Derby Derby North Jn. and Chaddesden sidings amended. GN
03-Oct-2020 Derby Cameras added. GN
01-Oct-2020 LTS Lines Minor corrections and some routes added. GN
27-Sep-2020 LTS Lines Updated for Q5 and Q6 TDs. GN
27-Sep-2020 Liverpool Street Updated for Q4 TD. GN
13-Sep-2020 Berwick Converted to wide format and Tyne & Wear Metro added. GN
13-Sep-2020 Tyneside Tyne & Wear Metro coverage extended and other areas checked and updated. GN
10-Sep-2020 Tyneside Newcastle area redrawn. GN
07-Sep-2020 Banbury Reservoir sidings layout corrected. GN
06-Sep-2020 Birmingham Coventry layout corrected. Some minor corrections. Junction links added. GN
05-Sep-2020 Bristol Minor corrections. GN
03-Sep-2020 Liverpool Ditton area recontrol to ROC alterations. Junction links added. GN
03-Sep-2020 Euston Minor corrections. GN
30-Aug-2020 Rugby Minor corrections. GN
30-Aug-2020 Bletchley Minor corrections. GN
30-Aug-2020 Chilterns Minor corrections. GN
30-Aug-2020 Banbury Minor corrections. GN
27-Aug-2020 Hope Valley Minor correction and adjacent diagram links updated. GN
27-Aug-2020 Sheffield Adjacent diagram links updated. GN
27-Aug-2020 Derby Adjacent diagram links updated. GN
27-Aug-2020 Leicester Adjacent diagram links updated. GN
27-Aug-2020 WestHampstead Adjacent diagram links updated. GN
27-Aug-2020 Manchester East Minor corrections and adjacent diagram links updated. GN
27-Aug-2020 Manchester East Minor corrections and adjacent diagram links updated. GN
27-Aug-2020 Stafford Converted to wide format. Minor corrections and adjacent diagram links updated. GN
27-Aug-2020 Rugby Combined with former Nuneaton diagram and south end of diagram transferred to new Bletchley diagram. Some redrawing ato cover R2 TD area nd adjacent diagram links updated. GN
27-Aug-2020 Bletchley New diagram covering R1 TD area (north end of Euston diagram and south end of Rugby diagram. GN
27-Aug-2020 Euston North end (R1 TD area transferred to new Bletchley diagram and adjacent diagram links updated. GN
27-Aug-2020 Thames Valley Minor corrections and adjacent diagram links updated. GN
27-Aug-2020 Chilterns Diagram redrawn and update to incoporate CPRR line and camera. Aynho Jn. northwards section transferred to new Banbury diagram. GN
27-Aug-2020 Banbury New diagram covering north end of former Chilterns diagram. GN
27-Aug-2020 Snow Hill Minor corrections and adjacent diagram links updated. GN
27-Aug-2020 Birmingham Minor corrections and adjacent diagram links updated. GN
09-Aug-2020 Leeds & West Yorks Apperley Bridge camera added. Junction links added. GN
08-Aug-2020 Woking Woking station platform gif corrected. GN
03-Aug-2020 Tonbridge Station links for Chislehurst and Petts Wood corrected. Programming updated and junction links added. GN
03-Aug-2020 SoutheastLondon Minor corrections to signal berths altered during recontrol. GN
03-Aug-2020 Yoker Finnieston East Jn. corrected. GN
30-Jul-2020 SoutheastLondon Hither Green area recontrol update. GN
30-Jul-2020 Peterborough Note re Peterborough cameras removed. GN
24-Jul-2020 LTSLines Barking Riverside extension progress added. Minor amendments to Purfleet area. GN
21-Jul-2020 Guildford Links for IoWSR updated. GN
19-Jul-2020 Yoker Minor corrections. GN
17-Jul-2020 Yoker Converted to wide format and detailing added. Missing signals added and updated diagram and location links. GN
17-Jul-2020 West Hampstead Updated diagram and location links. GN
15-Jul-2020 West Highland Dalmuir camera icon removed. Updated location links. GN
13-Jul-2020 Teesside Updated station and location links. GN
13-Jul-2020 Woking Updated station and location links. GN
13-Jul-2020 Cambrian Updated station and location links. GN
13-Jul-2020 Aberdeen Updated station and location links. GN
07-Jul-2020 West Anglia Angel Road station shown as closed. Some other minor alterations. GN
07-Jul-2020 Liverpool Street Junction added at Lea Bridge. Link at Stratford Jubilee Line corrected. Some other minor alterations. GN
16-Jun-2020 Peterborough Peterborough cameras updated. Links added at non-station locations. GN
11-Jun-2020 Preston Leyland 2 camera added. Minor corrections. GN
10-Jun-2020 Hope Valley New diagram added GN
07-Jun-2020 Manchester South Links added at junctions. Bi-directional signalling added in Holmes Chapel / Chelford area. Section west of Altrincham drawn. GN
07-Jun-2020 Crewe Links added at junctions. Bi-directional signalling added in Sandbach area GN
04-Jun-2020 Guildford Links added at junctions. GN
04-Jun-2020 Leicester Signal 6065 at Wellingborough corrected. Links added at jucntions. GN
31-May-2020 Leeds Leeds platform 1 alteration GN
31-May-2020 Pennines Various correction and links updated GN
05-May-2020 Ely Redrawn in wide format and details added. GN
05-May-2020 March Detailed and extended towards Norwich at Ely North Jn. GN
04-May-2020 Peterborough Minor corrections. GN
04-May-2020 Derby LNWR Jn. layout corrected. GN
20-Apr-2020 Cambrian Redrawn in wide format and Dovey Junction camera added. GN
14-Apr-2020 York York South camera removed. GN
11-Apr-2020 Peterborough Redrawn in wide format. Werrington diveunder added. Various details added and minor corrections. GN
11-Apr-2020 March Initial drawing of new diagram added to fill diagram gap between Peterborough and Ely areas. GN
11-Apr-2020 Information Basic key information explaining diagrams. GN
30-Mar-2020 Derby Missing signals in Stenson Jn area added. GN
26-Mar-2020 Crewe Minor corrections. GN
26-Mar-2020 Leicester Missing signals in Loughborough/Syston area added. GN
22-Mar-2020 Crewe Crewe area redrawn. Converted to wide format. GN
20-Mar-2020 Erewash Attenborough station link corrected. GN
18-Mar-2020 Euston Watford Jn. to Camden redrawn. GN
13-Mar-2020 Euston Camden/Euston section redrawn. Converted to wide format. GN
04-Mar-2020 Woking Minor corrections to route coding. GN
04-Mar-2020 Waterloo Long standing issue with SU TD resolved allowing area to be live again and routes added for that area. GN
04-Mar-2020 Aberdeen and Inverness Route coding updated and split on diagrams now between Insch and Inverurie to improve overall size. GN
03-Mar-2020 West Manchester Signal corrected at Walkden. GN
01-Mar-2020 Rugby Transferred to wide format diagram. Bedford line removed as now on West Hampstead diagram. Some minor corrections/detailing. GN
28-Feb-2020 Norwich and Colchester East Suffolk line moved to Great Yarmouth diagram, Updates to fringes with Great Yarmouth diagram GN
28-Feb-2020 Great Yarmouth East Suffolk line transferred from Norwich/Colchester diagrams. Minor route coding corrections, Note re aspects reversed added. GN
27-Feb-2020 West Hampstead New signal section added on Bletchley line (installation date unknown) GN
19-Feb-2020 Eastleigh Missing signal added at Wilton Jn., Crossover added at East Grimstead, Some redrawing of Southampton area to improve layout. GN
18-Feb-2020 Liverpool Converted to wide format. Signal added at Runcorn. Sutton Weaver crossover added. Route Frodsham / Runcorn East added to link with Warrington, Crewe and Merseyrail diagrams. GN
16-Feb-2020 Guildford Minor route coding corrections GN
10-Feb-2020 Euston Converted to wide format. Layout/signals updated Wembley Central and Euston (HS2 works). St Albans Abbey branch added. GN
09-Feb-2020 Great Yarmouth Routes added GN
07-Feb-2020 Norwich Minor amendments and links updated GN
07-Feb-2020 Colchester Minor amendments and links updated GN
07-Feb-2020 Great Yarmouth New diagram covering Brundall to Great Yarmouth and Lowestoft GN
17-Jan-2020 Guildford Routes added in Havant / Portsmouth area plus minor amendments GN
16-Jan-2020 Thames Valley Minor redrawing and corrections GN
05-Jan-2020 West Hampstead Minor corrections GN
05-Jan-2020 Dorset Wool/Wareham/Poole - signal aspects added and general updates MR
04-Jan-2020 Warrington Springs Branch depot and Ashton in Makerfield added MR
04-Jan-2020 Leicester Wellingborough / Sharnbrook 4 tracking GN
03-Jan-2020 West Hampstead Wellingborough / Sharnbrook 4 tracking. Bletchley line added to diagram GN
03-Jan-2020 Dorset Brockenhurst/Bournemouth/Dorchester - signal aspects added MR
02-Jan-2020 Warrington Warrington West added and minor corrections GN
01-Jan-2020 Motherwell Minor corrections GN
25-Dec-2019 Motherwell Recontrol of Carstairs and WCML south area GN
24-Dec-2019 West Hampstead 4 tracking north of Sharnbrook added, St Pancras area extended to Belle Isle, other redrawing of area and detailing added GN
23-Dec-2019 Berwick Morpeth/Widdrington area - signal aspects added MR
9-Dec-2019 Edinburgh Dunbar platform 2 added, Edinburgh 5/6 extended to be geographically accurate, Oakbank viaduct name corrected GN
6-Dec-2019 Brighton Lewes/Eastbourne area resignalling GN
25-Oct-2019 Exeter Dawlish Warren camera added plus some minor detailing/gif updates GN
24-Oct-2019 Teesside Missing crossover at Middlesbrough added GN
24-Oct-2019 Leicester Spelling of Frisby corrected GN
12-Oct-2019 Newport West end of C1 TD area transferred from Cardiff diagram. Altered to wide format and some detailing added GN
12-Oct-2019 Cardiff West end of Cardiff area redrawn and corrected. Some redrawing of lower Valleys area. East end of diagram (C1 TD) transferred to Newport diagram GN
10-Oct-2019 Leeds Extended to Dewsbury (Y2 TD) ex Pennines diagram GN
09-Oct-2019 Cardiff East end of Cardiff area corrected GN
25-Sep-2019 Wolverhampton Missing signals / points added. Link to Shreswbury added GN
19-Sep-2019 Tayside Highland Spring siding added at Blackford and amended links to new Inverness diagram GN
19-Sep-2019 Far North Updated coding and amended links to new Inverness diagram GN
19-Sep-2019 Aberdeen Area west of Inverurie transferred to new Inverness diagram GN
19-Sep-2019 Inverness New diagram to replace Highland Main line diagram after combining with route to Aberdeen to put all routes controlled from new work station at Inverness GN
17-Sep-2019 Woking Routes completed GN
03-Sep-2019 Erewash Chesterfield cameras and missing signal added GN
01-Sep-2019 Woking Redraw and route adding started GN
17-Aug-2019 Aberdeen Minor corrections. Keith and Dufftown railway route added. GN
16-Aug-2019 Aberdeen Routes added where available. GN
12-Aug-2019 Aberdeen Aberdeen - Dyce - Inverurie updated for doubling/resignalling. GN
08-Aug-2019 Colchester Minor corrections. GN
08-Aug-2019 Norwich Felixstowe branch updated (also covered by Colchester diagram). GN
01-July-2019 York Updated with ROC cameras. GN
21-July-2019 Manchester West Metrolink tram route updated. Trafford Park freight terminal area corrected layout. GN
18-July-2019 Worcester Diagram completed. GN
18-July-2019 Birmingham Bromsgrove/Worcester (BG TD) area transferred to Worcester diagram. GN
18-July-2019 Gloucester Link to Worcester diagram amended. GN
18-July-2019 Snow Hill Link to Worcester diagram amended. GN
14-July-2019 Birmingham Link added to Worcester diagram, some minor corrections. GN
13-July-2019 Worcester New diagram added. Ledbury to Worcestershire Parkway. Further extensions to be added later. GN
13-July-2019 Hereford Link added to Worcester diagram, level crossing details added. GN
13-July-2019 Thames Valley Oxford area redrawn and updated with 'wrong' direction signals. GN
11-July-2019 Thames Valley Swindon area redrawn and updated with 'wrong' direction signals. GN
04-July-2019 Thames Valley Didcot area redrawn and route to Bourton updated with 'wrong' direction signals. GN
04-July-2019 Paddington Link at Southcote Jn. updated for Newbury. GN
03-July-2019 Thames Valley 'Berks and Hants' route moved to Westbury. Westerleigh Jn. section moved to Bristol diagram. D2 and D9 TDs removed. GN
03-July-2019 Woking Link at Southcote Jn. updated for Newbury. GN
03-July-2019 Westbury 'Berks' and Hants' route added from Thames Valley diagram. D2 TD added. GN
03-July-2019 Bristol Westerleigh Jn. section added from Gloucester diagram. Some signals (and WW TD) at Bradford-on-Avon removed as duplicated on Westbury diagram. GN
03-July-2019 Gloucester Link to Bristol amended. GN
23-June-2019 West London Shepperton Line resignalling. Routes added Barnes area. GN
23-June-2019 Waterloo Shepperton Line resignalling. Routes added Earlsfield / East Putney to New Malden / Chessington South / Leatherhead. GN
14-June-2019 Leicester Some berths at East Midlands Parkway fringe transferred to Erewash to match train describer feeds. Market Harborough area updated. Syston / Melton Mowbray/ Manton Jn. / Stamford area updated / added to link to Peterborough diagram. GN
11-June-2019 Erewash East Midlands Freight terminal added. Some berths at East Midlands Parkway fringe transferred from Leicester to match train describer feeds GN
08-June-2019 Shrewsbury Camera position added and some minor amendments made GN
05-June-2019 Doncaster Converted to wider format. Doncaster station area partially redrawn corrected and camera position added GN
30-May-2019 Leeds and West Yorks Minor corrections GN
23-May-2019 Leeds and West Yorks Converted to wider format. Missing signal added at Shipley, missing signals added around Engine Shed Jn. area. Some redrawing of various area and Stourton area reversed. Harrogate line extended to link up with York diagram GN
20-May-2019 York two missing berth added in Dringhouses/Holgate area, Link to Leeds diagram (Harrogate line added at Poppleton GN
22-April-2019 Southeast London Recontrol of Angerstein area and some other minor amendments/corrections GN
06-April-2019 Bristol Bi-directional working added Bath area and Highbridge Loop GN
01-April-2019 Fife Signals updated Falkirk Grahamston area. Methil line and Fife Heritage Railway added (Cupar crossover removed from diagram 6 April) GN
27-Mar-2019 Highland Main Line Routes added GN
26-Mar-2019 ManchesterWest Missing signals added for reversible working Eccles/Ordsall Lane GN
25-Mar-2019 Highland Main Line New signalling in Pitlochry and Kincraig / Moy areas GN
25-Mar-2019 West Anglia level crossings added; third running line added between Coppermill Jn and Meridian Water MR
16-Mar-2019 Crossrail1 New diagram. Waiting for feed to be made live when line opens GN
11-Mar-2019 Teesside Bowesfield recontrol GN
11-Mar-2019 West Anglia area now controlled from Romford - signal aspects added MR
16-Feb-2019 South London Peckham Rye platforms 1/2 corrected GN
13-Feb-2019 Southeast London Lewisham / Hayes signalling recontrol GN
08-Feb-2019 Cornwall Detailing added and some minor corrections made GN
01-Feb-2019 Cornwall Looe Branch added and programming/gifs updated GN
01-Feb-2019 Exeter Errors at Newton Abbot and Exeter St Thomas corrected and programming/gifs updated GN
30-Jan-2019 Wrexham New diagram GN
28-Jan-2019 Hereford New diagram GN
28-Jan-2019 Shrewsbury New diagram GN
20-Jan-2019 Woking Link to Paddington at Southcote Jn amended, wrongly positioned gif at Hinchley Wood corrected GN
20-Jan-2019 Teesside Billingham LC road corrected GN
10-Jan-2019 HighlandMainLine Signal corrected at Stanley Jn, spurious platform at Culloden removed, Link to Ladybank corrected GN
06-Jan-2019 York Signal at Low Gates corrected GN
19-Jan-2019 Liverpool Street almost 100 new signal aspects added between Stratford and Romford, including the Temple Mills and Woodgrange Park areas MR
12-Jan-2019 Edinburgh new bay platforms 5+6 at Waverley added; signal aspects at Millerhill and Tweedbank added MR
03-Jan-2019 Liverpool Wavertree resignalling (Allerton/Speke 'boxes abolished) including the addition of signal aspects in the resignalled area MR
29-Dec-2018 Leeds Converted to wide format diagram and Church Fenton area transferred from York diagram GN
29-Dec-2018 York Church Fenton area (Y2 TD) transferred to Leeds diagram to avoid need for Y2 TD on diagram GN
28-Dec-2018 East Yorks Selby area transferred to York diagram GN
28-Dec-2018 York Selby area transferred from EastYorks diagram GN
26-Dec-2018 York Updated for recontrol to ROC Y1 TD GN
09-Dec-2018 Tayside Signal identity at Invergowrie corrected. Programming/gifs and some detailing updated GN
02-Dec-2018 LTS Lines Updated with Underground lines etc, Dagenham camera and converted to wide format GN
29-Nov-2018 WestSomerset Williton cameras added GN
28-Nov-2018 EastYorks Minor corrections and detailing GN
25-Nov-2018 Tyneside Hartlepool area transferred to Teesside diagram. Converted to wide format and some missing signals added. GN
23-Nov-2018 Teesside Hartlepool area transferred from Tyneside diagram GN
22-Nov-2018 Arun Valley Missing signal at Barnham added. Signal aspects added to Barnham station area GN
19-Nov-2018 EastYorks Updated for Gilberdyke/Hessle resignalling GN
05-Nov-2018 Whitby New diagram covering Nunthorpe / Pickering to Whitby GN
05-Nov-2018 Teesside Diagram completed to Saltburn etc. GN
30-Oct-2018 York Redrawn in wide format and new cameras added at Dringhouses. Eaglescliffe area moved to Teesside diagram GN
30-Oct-2018 Teesside Initial new diagram transferring Eaglescliffe area from York ECML diaram GN
30-Oct-2018 Tyneside Links (to Teesside diagram) changed GN
05-Oct-2018 Liverpool Street Alterations for Crossrail in Bow and Gidea Park areas. Rearrangement of sections to improve layout GN
09-Sep-2018 Glasgow Central Minor corrections and redrawing of Muirhouse Junctions / Cathcart Circle area GN
01-Sep-2018 Motherwell Final updating/detailing of Motherwell/Holytown and Wishaw/Law Junction/Shotts GN
30-Aug-2018 Motherwell Signal aspects added to the resignalled lines between Motherwell/Holytown and Wishaw/Law Junction/Shotts MR
20-Aug-2018 Aberdeen Kittybrewster - Dyce redoubling. Waiting for train reporting to be livened up for Dye area. GN
01-Aug-2018 Glasgow Central Polmadie and Rutherglen area alterations and resignalling. GN
01-Aug-2018 Motherwell Minor changes to berths in connection with Rutherglen alterations on Glasgow Central diagram GN
30-Jul-2018 Liverpool Lime Street resignalling (Lime Street 'box abolished) including the addition of signal aspects in the resignalled area MR
23-Jul-2018 Thames Valley Oxford remodelling + resignalling (Oxford PSB abolished) including the addition of signal aspects in the resignalled area MR
01-Jun-2018 Manchester East Minor corrections/updates to recently redrawn area. Stalybridge / Guide Bridge and area to south and east of diagram redrawn and detailed (minor corrections made 03-Jun-2018) GN
30-May-2018 Merseyrail Maghull North station updated, some minor redrawing and diagram extended to Helsby (non-reporting area) to extend diagram coverage GN
14-May-2018 Manchester East Signal aspects added to recently resignalled Ashton Moss and Denton Junction areas MR
09-May-2018 Liverpool Runcorn resignalling (Runcorn and Halton Junction 'boxes abolished) including signal aspects on the resignalled section MR
30-Apr-2018 Manchester East Miles Platting / Stalybridge resignalling and East Lancs Railway and Metrolink lines in area added GN
24-Apr-2018 Plymouth extra signal 'sections' in the Menheniot area commissioned this week MR
10-Apr-2018 Motherwell Signal aspects added to recently resignalled Coatbridge/Mossend/Holytown areas; broken aspects in Motherwell/Carstairs areas fixed MR
07-Apr-2018 Nottingham Missing signals added Beeston / Mansfield Jn and Netherfield / Radcliffe GN
04-Apr-2018 Bristol Bristol TM resignalling (Nailsea to Keynsham/Narroways) including extra 'mid platform' berths at Temple Meads MR
04-Apr-2018 Crewe Chester area removed (Chester can now be found on the new 'North Wales' diagram) MR
02-Apr-2018 Waterloo Resignalling of Sutton and Wimbledon areas (minor corrections made 03-Apr-2018 once signalling live) GN
02-Apr-2018 South London Resignalling of Sutton and Wimbledon areas. Aspects being added where available. (minor corrections made 03-Apr-2018 once signalling live) GN
01-Apr-2018 Motherwell Resignalling of Mossend and Coatbridge areas (minor corrections made 04-Apr-2018 once signalling live) GN
27-Mar-2018 North Wales Chester area added (and amended) from Crewe diagram prior to transfer from that diagram GN
26-Mar-2018 North Wales Shotton - Colwyn Bay signalling amended GN
01-Mar-2018 Leicester Signal aspects added to recently resignalled Kettering/Corby/Wigston areas MR
27-Feb-2018 Leicester Some detailing of Melton/Mowbray / Oakham / Corby area. Bi-directional signals added Market Harborough / Kilby Bridge. Line details shown west of Stud Farm to link up with Derby diagram. GN
25-Feb-2018 Leicester Reinstatement of double track Kettering / Corby and resignalling control Sharnbrook / Wigston area. Initial main alterations only to ensure diagram continued working for train tracking. Further work in progress. GN
25-Feb-2018 SouthLondon Spa Valley Railway and Groombridge camera added. Realignment of Herne Hill / Peckham Rye area to eliminate break in line. GN
12-Feb-2018 Pennines Corrected issues arising from reformatting / area changes. MR
12-Feb-2018 Stirling Added signal aspects. TA
08-Feb-2018 WestLondon Various long standing minor errors corrected. Acton Wells Jn and Strawberry Hill areas redrawn to improve layout. Aspects now displayed where available. GN
06-Feb-2018 ManchesterWest missing signal aspects on Ordsall Chord added; 'stuck' berths at Manchester Victoria fixed MR
05-Feb-2018 Gloucester Link to Thames Valley corrected. Some detailing added GN
05-Feb-2018 SoutheastLondon Line directions corrected and notations added North Kent East Jn area GN
31-Jan-2018 Motherwell Signal aspects added / corrected GN
26-Jan-2018 Edinburgh Further details added GN
25-Jan-2018 HighlandMainLine / Tayside / GlasgowQS / Motherwell Links to adjoining diagrams (Edinburgh /Fife) updated GN
24-Jan-2018 Fife New diagram replacing former Cupar - Haymarket diagram after part transferred to Edinburgh diagram GN
24-Jan-2018 Worksop-Lincoln signal aspects added to Lincoln area MR
24-Jan-2018 Rugby non functioning signal aspects in the Rugby and Northampton areas fixed MR
24-Jan-2018 Chilterns missing crossover at Leamington Spa (Foundry Wood Junction) added MR
23-Jan-2018 Cambridge non functioning signal aspects between Cambridge and Audley End fixed MR
23-Jan-2018 Rugby missing 97xx aspects at Milton Keynes Central station added MR
23-Jan-2018 Newport over 30 signal aspects added/corrected MR
23-Jan-2018 Ely signal aspects added/corrected at Bury St.Edmunds MR
22-Jan-2018 Pennines Re-signalling around Huddersfield etc. Control to York ROC. Aspects added TM
22-Jan-2018 Southeast London Alterations correcting a few gif errors. Signal 2243 TD amended from X2 to X3. Crossover at Bermondsey flyover corrected, missing signal at Bermondsey added and minor redrawing of this area to improve general look. Some detailing of line names and directions added. GN
22-Jan-2018 South London Streatham South Junction crossover corrected. Junction layouts at Tulse Hill and Loughborough Junction corrected. Elephant & Castle station and immediate vicinity lines removed (duplicated with later SouthEastLondon diagram). GN
22-Jan-2018 Edinburgh Haymarket area and sections west of station on EB TD transferred from Cupar diagram (will be removed from there later but at present duplicated). Platform extensions (5, 6and 12) at Waverley added. Millerhill depot and associated signalling added. Missing signals at Gransthouse added, ECML LCs added. A lot more detailing still to do. GN
21-Jan-2018 Chilterns Oxford Parkway area signal aspects corrected; Aynho Junction berth 4763 signal aspect added ; Leamington station signal aspects corrected MR
18-Jan-2018 Nottingham missing aspects in the Beeston area added MR
17-Jan-2018 Paddington Twyford area signal aspects corrected MR
16-Jan-2018 Sheffield Sheffield station signal aspects corrected MR
16-Jan-2018 Stafford Colwich area signal aspects corrected MR
02-Jan-2018 Southeast London Re-signalling of London Bridge area, Kidbrooke crossover removed GN
31-Dec-2017 Paddington Tidy-up and detailing GN
29-Dec-2017 Birmingham Corrected errors TM
24-Dec-2017 Birmingham Re-signalling of Perry Barr to Aston / Soho / Tipton TM
27-Dec-2017 Manchester West Market Street platform on Metrolink corrected. GN
27-Dec-2017 Highland ML Pitlochry alteration GN
27-Dec-2017 Paddington Re-signalling of Paddington area (Crossrail) GN
27-Dec-2017 Glasgow QS Re-signalling of Carmuirs area TA
26-Dec-2017 Cupar Re-signalling of Carmuirs area TA
24-Dec-2017 Brighton Revised Redhill layout GN
24-Dec-2017 - change log started -