Recent Changes

From Railcam Support
Revision as of 14:44, 13 January 2019 by Freightmaster (Talk | contribs)

Jump to: navigation, search
Diagram Changes - IN-PROGRESS
Diagram Notes Editor
Shenfield Alterations to Gidea Park area for Crossrail GN
Aberdeen Dyce - Inverurie redoubling/resignalling (2019) GN
Southeast London Recontrol of Lewisham/Hayes area (TBA) GN
Diagram Changes - LIVE
Live Date Diagram Notes Editor
12-Jan-2019 Edinburgh new bay platforms 5+6 at Waverley added; signal aspects at Millerhill and Tweedbank added MR
03-Jan-2019 Liverpool Wavertree resignalling (Allerton/Speke 'boxes abolished) including the addition of signal aspects in the resignalled area MR
29-Dec-2018 Leeds Converted to wide format diagram and Church Fenton area transferred from York diagram GN
29-Dec-2018 York Church Fenton area (Y2 TD) transferred to Leeds diagram to avoid need for Y2 TD on diagram GN
28-Dec-2018 East Yorks Selby area transferred to York diagram GN
28-Dec-2018 York Selby area transferred from EastYorks diagram GN
26-Dec-2018 York Updated for recontrol to ROC Y1 TD GN
09-Dec-2018 Tayside Signal identity at Invergowrie corrected. Programming/gifs and some detailing updated GN
02-Dec-2018 LTS Lines Updated with Underground lines etc, Dagenham camera and converted to wide format GN
29-Nov-2018 WestSomerset Williton cameras added GN
28-Nov-2018 EastYorks Minor corrections and detailing GN
25-Nov-2018 Tyneside Hartlepool area transferred to Teesside diagram. Converted to wide format and some missing signals added. GN
23-Nov-2018 Teesside Hartlepool area transferred from Tyneside diagram GN
22-Nov-2018 Arun Valley Missing signal at Barnham added. Signal aspects added to Barnham station area GN
19-Nov-2018 EastYorks Updated for Gilberdyke/Hessle resignalling GN
05-Nov-2018 Whitby New diagram covering Nunthorpe / Pickering to Whitby GN
05-Nov-2018 Teesside Diagram completed to Saltburn etc. GN
30-Oct-2018 York Redrawn in wide format and new cameras added at Dringhouses. Eaglescliffe area moved to Teesside diagram GN
30-Oct-2018 Teesside Initial new diagram transferring Eaglescliffe area from York ECML diaram GN
30-Oct-2018 Tyneside Links (to Teesside diagram) changed GN
05-Oct-2018 Liverpool Street Alterations for Crossrail in Bow and Gidea Park areas. Rearrangement of sections to improve layout GN
09-Sep-2018 Glasgow Central Minor corrections and redrawing of Muirhouse Junctions / Cathcart Circle area GN
01-Sep-2018 Motherwell Final updating/detailing of Motherwell/Holytown and Wishaw/Law Junction/Shotts GN
30-Aug-2018 Motherwell Signal aspects added to the resignalled lines between Motherwell/Holytown and Wishaw/Law Junction/Shotts MR
20-Aug-2018 Aberdeen Kittybrewster - Dyce redoubling. Waiting for train reporting to be livened up for Dye area. GN
01-Aug-2018 Glasgow Central Polmadie and Rutherglen area alterations and resignalling. GN
01-Aug-2018 Motherwell Minor changes to berths in connection with Rutherglen alterations on Glasgow Central diagram GN
30-Jul-2018 Liverpool Lime Street resignalling (Lime Street 'box abolished) including the addition of signal aspects in the resignalled area MR
23-Jul-2018 Thames Valley Oxford remodelling + resignalling (Oxford PSB abolished) including the addition of signal aspects in the resignalled area MR
01-Jun-2018 Manchester East Minor corrections/updates to recently redrawn area. Stalybridge / Guide Bridge and area to south and east of diagram redrawn and detailed (minor corrections made 03-Jun-2018) GN
30-May-2018 Merseyrail Maghull North station updated, some minor redrawing and diagram extended to Helsby (non-reporting area) to extend diagram coverage GN
14-May-2018 Manchester East Signal aspects added to recently resignalled Ashton Moss and Denton Junction areas MR
09-May-2018 Liverpool Runcorn resignalling (Runcorn and Halton Junction 'boxes abolished) including signal aspects on the resignalled section MR
30-Apr-2018 Manchester East Miles Platting / Stalybridge resignalling and East Lancs Railway and Metrolink lines in area added GN
24-Apr-2018 Plymouth extra signal 'sections' in the Menheniot area commissioned this week MR
10-Apr-2018 Motherwell Signal aspects added to recently resignalled Coatbridge/Mossend/Holytown areas; broken aspects in Motherwell/Carstairs areas fixed MR
07-Apr-2018 Nottingham Missing signals added Beeston / Mansfield Jn and Netherfield / Radcliffe GN
04-Apr-2018 Bristol Bristol TM resignalling (Nailsea to Keynsham/Narroways) including extra 'mid platform' berths at Temple Meads MR
04-Apr-2018 Crewe Chester area removed (Chester can now be found on the new 'North Wales' diagram) MR
02-Apr-2018 Waterloo Resignalling of Sutton and Wimbledon areas (minor corrections made 03-Apr-2018 once signalling live) GN
02-Apr-2018 South London Resignalling of Sutton and Wimbledon areas. Aspects being added where available. (minor corrections made 03-Apr-2018 once signalling live) GN
01-Apr-2018 Motherwell Resignalling of Mossend and Coatbridge areas (minor corrections made 04-Apr-2018 once signalling live) GN
27-Mar-2018 North Wales Chester area added (and amended) from Crewe diagram prior to transfer from that diagram GN
26-Mar-2018 North Wales Shotton - Colwyn Bay signalling amended GN
01-Mar-2018 Leicester Signal aspects added to recently resignalled Kettering/Corby/Wigston areas MR
27-Feb-2018 Leicester Some detailing of Melton/Mowbray / Oakham / Corby area. Bi-directional signals added Market Harborough / Kilby Bridge. Line details shown west of Stud Farm to link up with Derby diagram. GN
25-Feb-2018 Leicester Reinstatement of double track Kettering / Corby and resignalling control Sharnbrook / Wigston area. Initial main alterations only to ensure diagram continued working for train tracking. Further work in progress. GN
25-Feb-2018 SouthLondon Spa Valley Railway and Groombridge camera added. Realignment of Herne Hill / Peckham Rye area to eliminate break in line. GN
12-Feb-2018 Pennines Corrected issues arising from reformatting / area changes. MR
12-Feb-2018 Stirling Added signal aspects. TA
08-Feb-2018 WestLondon Various long standing minor errors corrected. Acton Wells Jn and Strawberry Hill areas redrawn to improve layout. Aspects now displayed where available. GN
06-Feb-2018 ManchesterWest missing signal aspects on Ordsall Chord added; 'stuck' berths at Manchester Victoria fixed MR
05-Feb-2018 Gloucester Link to Thames Valley corrected. Some detailing added GN
05-Feb-2018 SoutheastLondon Line directions corrected and notations added North Kent East Jn area GN
31-Jan-2018 Motherwell Signal aspects added / corrected GN
26-Jan-2018 Edinburgh Further details added GN
25-Jan-2018 HighlandMainLine / Tayside / GlasgowQS / Motherwell Links to adjoining diagrams (Edinburgh /Fife) updated GN
24-Jan-2018 Fife New diagram replacing former Cupar - Haymarket diagram after part transferred to Edinburgh diagram GN
24-Jan-2018 Worksop-Lincoln signal aspects added to Lincoln area MR
24-Jan-2018 Rugby non functioning signal aspects in the Rugby and Northampton areas fixed MR
24-Jan-2018 Chilterns missing crossover at Leamington Spa (Foundry Wood Junction) added MR
23-Jan-2018 Cambridge non functioning signal aspects between Cambridge and Audley End fixed MR
23-Jan-2018 Rugby missing 97xx aspects at Milton Keynes Central station added MR
23-Jan-2018 Newport over 30 signal aspects added/corrected MR
23-Jan-2018 Ely signal aspects added/corrected at Bury St.Edmunds MR
22-Jan-2018 Pennines Re-signalling around Huddersfield etc. Control to York ROC. Aspects added TM
22-Jan-2018 Southeast London Alterations correcting a few gif errors. Signal 2243 TD amended from X2 to X3. Crossover at Bermondsey flyover corrected, missing signal at Bermondsey added and minor redrawing of this area to improve general look. Some detailing of line names and directions added. GN
22-Jan-2018 South London Streatham South Junction crossover corrected. Junction layouts at Tulse Hill and Loughborough Junction corrected. Elephant & Castle station and immediate vicinity lines removed (duplicated with later SouthEastLondon diagram). GN
22-Jan-2018 Edinburgh Haymarket area and sections west of station on EB TD transferred from Cupar diagram (will be removed from there later but at present duplicated). Platform extensions (5, 6and 12) at Waverley added. Millerhill depot and associated signalling added. Missing signals at Gransthouse added, ECML LCs added. A lot more detailing still to do. GN
21-Jan-2018 Chilterns Oxford Parkway area signal aspects corrected; Aynho Junction berth 4763 signal aspect added ; Leamington station signal aspects corrected MR
18-Jan-2018 Nottingham missing aspects in the Beeston area added MR
17-Jan-2018 Paddington Twyford area signal aspects corrected MR
16-Jan-2018 Sheffield Sheffield station signal aspects corrected MR
16-Jan-2018 Stafford Colwich area signal aspects corrected MR
02-Jan-2018 Southeast London Re-signalling of London Bridge area, Kidbrooke crossover removed GN
31-Dec-2017 Paddington Tidy-up and detailing GN
29-Dec-2017 Birmingham Corrected errors TM
24-Dec-2017 Birmingham Re-signalling of Perry Barr to Aston / Soho / Tipton TM
27-Dec-2017 Manchester West Market Street platform on Metrolink corrected. GN
27-Dec-2017 Highland ML Pitlochry alteration GN
27-Dec-2017 Paddington Re-signalling of Paddington area (Crossrail) GN
27-Dec-2017 Glasgow QS Re-signalling of Carmuirs area TA
26-Dec-2017 Cupar Re-signalling of Carmuirs area TA
24-Dec-2017 Brighton Revised Redhill layout GN
24-Dec-2017 - change log started -