Difference between revisions of "Recent Changes"
From Railcam Support
Line 22: | Line 22: | ||
! scope="col" | Editor | ! scope="col" | Editor | ||
|- | |- | ||
− | | 03-Jan- | + | | 03-Jan-2020 || Dorset || Brokenhurst/Bournemouth/Dorchester - signal aspects added || MR |
|- | |- | ||
| 25-Dec-2019 || Motherwell || Recontrol of Carstairs and WCML south area || GN | | 25-Dec-2019 || Motherwell || Recontrol of Carstairs and WCML south area || GN |
Revision as of 05:42, 3 January 2020
Diagram | Notes | Editor | |
---|---|---|---|
Eastleigh | Alterations in Southampton/Redbridge area (Was planned 11th and 18th February 2019 but postponed revised date awaited) | GN | |
SoutheastLondon | Resignalling/recontrol London Bridge panel 7 (Easter 2020) | GN or TM | |
Leicester | Kettering/Bedford Four tracking (Jan 2020) | GN | |
Wherry Lines | (February 2020) | ?? |
Live Date | Diagram | Notes | Editor |
---|---|---|---|
03-Jan-2020 | Dorset | Brokenhurst/Bournemouth/Dorchester - signal aspects added | MR |
25-Dec-2019 | Motherwell | Recontrol of Carstairs and WCML south area | GN |
24-Dec-2019 | West Hampstead | 4 tracking north of Sharnbrook added, St Pancras area extended to Belle Isle, other redrawing of area and detailing added | GN |
9-Dec-2019 | Edinburgh | Dunbar platform 2 added, Edinburgh 5/6 extended to be geographically accurate, Oakbank viaduct name corrected | GN |
6-Dec-2019 | Brighton | Lewes/Eastbourne area resignalling | GN |
25-Oct-2019 | Exeter | Dawlish Warren camera added plus some minor detailing/gif updates | GN |
24-Oct-2019 | Teesside | Missing crossover at Middlesbrough added | GN |
24-Oct-2019 | Leicester | Spelling of Frisby corrected | GN |
12-Oct-2019 | Newport | West end of C1 TD area transferred from Cardiff diagram. Altered to wide format and some detailing added | GN |
12-Oct-2019 | Cardiff | West end of Cardiff area redrawn and corrected. Some redrawing of lower Valleys area. East end of diagram (C1 TD) transferred to Newport diagram | GN |
10-Oct-2019 | Leeds | Extended to Dewsbury (Y2 TD) ex Pennines diagram | GN |
09-Oct-2019 | Cardiff | East end of Cardiff area corrected | GN |
25-Sep-2019 | Wolverhampton | Missing signals / points added. Link to Shreswbury added | GN |
19-Sep-2019 | Tayside | Highland Spring siding added at Blackford and amended links to new Inverness diagram | GN |
19-Sep-2019 | Far North | Updated coding and amended links to new Inverness diagram | GN |
19-Sep-2019 | Aberdeen | Area west of Inverurie transferred to new Inverness diagram | GN |
19-Sep-2019 | Inverness | New diagram to replace Highland Main line diagram after combining with route to Aberdeen to put all routes controlled from new work station at Inverness | GN |
17-Sep-2019 | Woking | Routes completed | GN |
03-Sep-2019 | Erewash | Chesterfield cameras and missing signal added | GN |
01-Sep-2019 | Woking | Redraw and route adding started | GN |
17-Aug-2019 | Aberdeen | Minor corrections. Keith and Dufftown railway route added. | GN |
16-Aug-2019 | Aberdeen | Routes added where available. | GN |
12-Aug-2019 | Aberdeen | Aberdeen - Dyce - Inverurie updated for doubling/resignalling. | GN |
08-Aug-2019 | Colchester | Minor corrections. | GN |
08-Aug-2019 | Norwich | Felixstowe branch updated (also covered by Colchester diagram). | GN |
01-July-2019 | York | Updated with ROC cameras. | GN |
21-July-2019 | Manchester West | Metrolink tram route updated. Trafford Park freight terminal area corrected layout. | GN |
18-July-2019 | Worcester | Diagram completed. | GN |
18-July-2019 | Birmingham | Bromsgrove/Worcester (BG TD) area transferred to Worcester diagram. | GN |
18-July-2019 | Gloucester | Link to Worcester diagram amended. | GN |
18-July-2019 | Snow Hill | Link to Worcester diagram amended. | GN |
14-July-2019 | Birmingham | Link added to Worcester diagram, some minor corrections. | GN |
13-July-2019 | Worcester | New diagram added. Ledbury to Worcestershire Parkway. Further extensions to be added later. | GN |
13-July-2019 | Hereford | Link added to Worcester diagram, level crossing details added. | GN |
13-July-2019 | Thames Valley | Oxford area redrawn and updated with 'wrong' direction signals. | GN |
11-July-2019 | Thames Valley | Swindon area redrawn and updated with 'wrong' direction signals. | GN |
04-July-2019 | Thames Valley | Didcot area redrawn and route to Bourton updated with 'wrong' direction signals. | GN |
04-July-2019 | Paddington | Link at Southcote Jn. updated for Newbury. | GN |
03-July-2019 | Thames Valley | 'Berks and Hants' route moved to Westbury. Westerleigh Jn. section moved to Bristol diagram. D2 and D9 TDs removed. | GN |
03-July-2019 | Woking | Link at Southcote Jn. updated for Newbury. | GN |
03-July-2019 | Westbury | 'Berks' and Hants' route added from Thames Valley diagram. D2 TD added. | GN |
03-July-2019 | Bristol | Westerleigh Jn. section added from Gloucester diagram. Some signals (and WW TD) at Bradford-on-Avon removed as duplicated on Westbury diagram. | GN |
03-July-2019 | Gloucester | Link to Bristol amended. | GN |
23-June-2019 | West London | Shepperton Line resignalling. Routes added Barnes area. | GN |
23-June-2019 | Waterloo | Shepperton Line resignalling. Routes added Earlsfield / East Putney to New Malden / Chessington South / Leatherhead. | GN |
14-June-2019 | Leicester | Some berths at East Midlands Parkway fringe transferred to Erewash to match train describer feeds. Market Harborough area updated. Syston / Melton Mowbray/ Manton Jn. / Stamford area updated / added to link to Peterborough diagram. | GN |
11-June-2019 | Erewash | East Midlands Freight terminal added. Some berths at East Midlands Parkway fringe transferred from Leicester to match train describer feeds | GN |
08-June-2019 | Shrewsbury | Camera position added and some minor amendments made | GN |
05-June-2019 | Doncaster | Converted to wider format. Doncaster station area partially redrawn corrected and camera position added | GN |
30-May-2019 | Leeds and West Yorks | Minor corrections | GN |
23-May-2019 | Leeds and West Yorks | Converted to wider format. Missing signal added at Shipley, missing signals added around Engine Shed Jn. area. Some redrawing of various area and Stourton area reversed. Harrogate line extended to link up with York diagram | GN |
20-May-2019 | York | two missing berth added in Dringhouses/Holgate area, Link to Leeds diagram (Harrogate line added at Poppleton | GN |
22-April-2019 | Southeast London | Recontrol of Angerstein area and some other minor amendments/corrections | GN |
06-April-2019 | Bristol | Bi-directional working added Bath area and Highbridge Loop | GN |
01-April-2019 | Fife | Signals updated Falkirk Grahamston area. Methil line and Fife Heritage Railway added (Cupar crossover removed from diagram 6 April) | GN |
27-Mar-2019 | Highland Main Line | Routes added | GN |
26-Mar-2019 | ManchesterWest | Missing signals added for reversible working Eccles/Ordsall Lane | GN |
25-Mar-2019 | Highland Main Line | New signalling in Pitlochry and Kincraig / Moy areas | GN |
25-Mar-2019 | West Anglia | level crossings added; third running line added between Coppermill Jn and Meridian Water | MR |
16-Mar-2019 | Crossrail1 | New diagram. Waiting for feed to be made live when line opens | GN |
11-Mar-2019 | Teesside | Bowesfield recontrol | GN |
11-Mar-2019 | West Anglia | area now controlled from Romford - signal aspects added | MR |
16-Feb-2019 | South London | Peckham Rye platforms 1/2 corrected | GN |
13-Feb-2019 | Southeast London | Lewisham / Hayes signalling recontrol | GN |
08-Feb-2019 | Cornwall | Detailing added and some minor corrections made | GN |
01-Feb-2019 | Cornwall | Looe Branch added and programming/gifs updated | GN |
01-Feb-2019 | Exeter | Errors at Newton Abbot and Exeter St Thomas corrected and programming/gifs updated | GN |
30-Jan-2019 | Wrexham | New diagram | GN |
28-Jan-2019 | Hereford | New diagram | GN |
28-Jan-2019 | Shrewsbury | New diagram | GN |
20-Jan-2019 | Woking | Link to Paddington at Southcote Jn amended, wrongly positioned gif at Hinchley Wood corrected | GN |
20-Jan-2019 | Teesside | Billingham LC road corrected | GN |
10-Jan-2019 | HighlandMainLine | Signal corrected at Stanley Jn, spurious platform at Culloden removed, Link to Ladybank corrected | GN |
06-Jan-2019 | York | Signal at Low Gates corrected | GN |
19-Jan-2019 | Liverpool Street | almost 100 new signal aspects added between Stratford and Romford, including the Temple Mills and Woodgrange Park areas | MR |
12-Jan-2019 | Edinburgh | new bay platforms 5+6 at Waverley added; signal aspects at Millerhill and Tweedbank added | MR |
03-Jan-2019 | Liverpool | Wavertree resignalling (Allerton/Speke 'boxes abolished) including the addition of signal aspects in the resignalled area | MR |
29-Dec-2018 | Leeds | Converted to wide format diagram and Church Fenton area transferred from York diagram | GN |
29-Dec-2018 | York | Church Fenton area (Y2 TD) transferred to Leeds diagram to avoid need for Y2 TD on diagram | GN |
28-Dec-2018 | East Yorks | Selby area transferred to York diagram | GN |
28-Dec-2018 | York | Selby area transferred from EastYorks diagram | GN |
26-Dec-2018 | York | Updated for recontrol to ROC Y1 TD | GN |
09-Dec-2018 | Tayside | Signal identity at Invergowrie corrected. Programming/gifs and some detailing updated | GN |
02-Dec-2018 | LTS Lines | Updated with Underground lines etc, Dagenham camera and converted to wide format | GN |
29-Nov-2018 | WestSomerset | Williton cameras added | GN |
28-Nov-2018 | EastYorks | Minor corrections and detailing | GN |
25-Nov-2018 | Tyneside | Hartlepool area transferred to Teesside diagram. Converted to wide format and some missing signals added. | GN |
23-Nov-2018 | Teesside | Hartlepool area transferred from Tyneside diagram | GN |
22-Nov-2018 | Arun Valley | Missing signal at Barnham added. Signal aspects added to Barnham station area | GN |
19-Nov-2018 | EastYorks | Updated for Gilberdyke/Hessle resignalling | GN |
05-Nov-2018 | Whitby | New diagram covering Nunthorpe / Pickering to Whitby | GN |
05-Nov-2018 | Teesside | Diagram completed to Saltburn etc. | GN |
30-Oct-2018 | York | Redrawn in wide format and new cameras added at Dringhouses. Eaglescliffe area moved to Teesside diagram | GN |
30-Oct-2018 | Teesside | Initial new diagram transferring Eaglescliffe area from York ECML diaram | GN |
30-Oct-2018 | Tyneside | Links (to Teesside diagram) changed | GN |
05-Oct-2018 | Liverpool Street | Alterations for Crossrail in Bow and Gidea Park areas. Rearrangement of sections to improve layout | GN |
09-Sep-2018 | Glasgow Central | Minor corrections and redrawing of Muirhouse Junctions / Cathcart Circle area | GN |
01-Sep-2018 | Motherwell | Final updating/detailing of Motherwell/Holytown and Wishaw/Law Junction/Shotts | GN |
30-Aug-2018 | Motherwell | Signal aspects added to the resignalled lines between Motherwell/Holytown and Wishaw/Law Junction/Shotts | MR |
20-Aug-2018 | Aberdeen | Kittybrewster - Dyce redoubling. Waiting for train reporting to be livened up for Dye area. | GN |
01-Aug-2018 | Glasgow Central | Polmadie and Rutherglen area alterations and resignalling. | GN |
01-Aug-2018 | Motherwell | Minor changes to berths in connection with Rutherglen alterations on Glasgow Central diagram | GN |
30-Jul-2018 | Liverpool | Lime Street resignalling (Lime Street 'box abolished) including the addition of signal aspects in the resignalled area | MR |
23-Jul-2018 | Thames Valley | Oxford remodelling + resignalling (Oxford PSB abolished) including the addition of signal aspects in the resignalled area | MR |
01-Jun-2018 | Manchester East | Minor corrections/updates to recently redrawn area. Stalybridge / Guide Bridge and area to south and east of diagram redrawn and detailed (minor corrections made 03-Jun-2018) | GN |
30-May-2018 | Merseyrail | Maghull North station updated, some minor redrawing and diagram extended to Helsby (non-reporting area) to extend diagram coverage | GN |
14-May-2018 | Manchester East | Signal aspects added to recently resignalled Ashton Moss and Denton Junction areas | MR |
09-May-2018 | Liverpool | Runcorn resignalling (Runcorn and Halton Junction 'boxes abolished) including signal aspects on the resignalled section | MR |
30-Apr-2018 | Manchester East | Miles Platting / Stalybridge resignalling and East Lancs Railway and Metrolink lines in area added | GN |
24-Apr-2018 | Plymouth | extra signal 'sections' in the Menheniot area commissioned this week | MR |
10-Apr-2018 | Motherwell | Signal aspects added to recently resignalled Coatbridge/Mossend/Holytown areas; broken aspects in Motherwell/Carstairs areas fixed | MR |
07-Apr-2018 | Nottingham | Missing signals added Beeston / Mansfield Jn and Netherfield / Radcliffe | GN |
04-Apr-2018 | Bristol | Bristol TM resignalling (Nailsea to Keynsham/Narroways) including extra 'mid platform' berths at Temple Meads | MR |
04-Apr-2018 | Crewe | Chester area removed (Chester can now be found on the new 'North Wales' diagram) | MR |
02-Apr-2018 | Waterloo | Resignalling of Sutton and Wimbledon areas (minor corrections made 03-Apr-2018 once signalling live) | GN |
02-Apr-2018 | South London | Resignalling of Sutton and Wimbledon areas. Aspects being added where available. (minor corrections made 03-Apr-2018 once signalling live) | GN |
01-Apr-2018 | Motherwell | Resignalling of Mossend and Coatbridge areas (minor corrections made 04-Apr-2018 once signalling live) | GN |
27-Mar-2018 | North Wales | Chester area added (and amended) from Crewe diagram prior to transfer from that diagram | GN |
26-Mar-2018 | North Wales | Shotton - Colwyn Bay signalling amended | GN |
01-Mar-2018 | Leicester | Signal aspects added to recently resignalled Kettering/Corby/Wigston areas | MR |
27-Feb-2018 | Leicester | Some detailing of Melton/Mowbray / Oakham / Corby area. Bi-directional signals added Market Harborough / Kilby Bridge. Line details shown west of Stud Farm to link up with Derby diagram. | GN |
25-Feb-2018 | Leicester | Reinstatement of double track Kettering / Corby and resignalling control Sharnbrook / Wigston area. Initial main alterations only to ensure diagram continued working for train tracking. Further work in progress. | GN |
25-Feb-2018 | SouthLondon | Spa Valley Railway and Groombridge camera added. Realignment of Herne Hill / Peckham Rye area to eliminate break in line. | GN |
12-Feb-2018 | Pennines | Corrected issues arising from reformatting / area changes. | MR |
12-Feb-2018 | Stirling | Added signal aspects. | TA |
08-Feb-2018 | WestLondon | Various long standing minor errors corrected. Acton Wells Jn and Strawberry Hill areas redrawn to improve layout. Aspects now displayed where available. | GN |
06-Feb-2018 | ManchesterWest | missing signal aspects on Ordsall Chord added; 'stuck' berths at Manchester Victoria fixed | MR |
05-Feb-2018 | Gloucester | Link to Thames Valley corrected. Some detailing added | GN |
05-Feb-2018 | SoutheastLondon | Line directions corrected and notations added North Kent East Jn area | GN |
31-Jan-2018 | Motherwell | Signal aspects added / corrected | GN |
26-Jan-2018 | Edinburgh | Further details added | GN |
25-Jan-2018 | HighlandMainLine / Tayside / GlasgowQS / Motherwell | Links to adjoining diagrams (Edinburgh /Fife) updated | GN |
24-Jan-2018 | Fife | New diagram replacing former Cupar - Haymarket diagram after part transferred to Edinburgh diagram | GN |
24-Jan-2018 | Worksop-Lincoln | signal aspects added to Lincoln area | MR |
24-Jan-2018 | Rugby | non functioning signal aspects in the Rugby and Northampton areas fixed | MR |
24-Jan-2018 | Chilterns | missing crossover at Leamington Spa (Foundry Wood Junction) added | MR |
23-Jan-2018 | Cambridge | non functioning signal aspects between Cambridge and Audley End fixed | MR |
23-Jan-2018 | Rugby | missing 97xx aspects at Milton Keynes Central station added | MR |
23-Jan-2018 | Newport | over 30 signal aspects added/corrected | MR |
23-Jan-2018 | Ely | signal aspects added/corrected at Bury St.Edmunds | MR |
22-Jan-2018 | Pennines | Re-signalling around Huddersfield etc. Control to York ROC. Aspects added | TM |
22-Jan-2018 | Southeast London | Alterations correcting a few gif errors. Signal 2243 TD amended from X2 to X3. Crossover at Bermondsey flyover corrected, missing signal at Bermondsey added and minor redrawing of this area to improve general look. Some detailing of line names and directions added. | GN |
22-Jan-2018 | South London | Streatham South Junction crossover corrected. Junction layouts at Tulse Hill and Loughborough Junction corrected. Elephant & Castle station and immediate vicinity lines removed (duplicated with later SouthEastLondon diagram). | GN |
22-Jan-2018 | Edinburgh | Haymarket area and sections west of station on EB TD transferred from Cupar diagram (will be removed from there later but at present duplicated). Platform extensions (5, 6and 12) at Waverley added. Millerhill depot and associated signalling added. Missing signals at Gransthouse added, ECML LCs added. A lot more detailing still to do. | GN |
21-Jan-2018 | Chilterns | Oxford Parkway area signal aspects corrected; Aynho Junction berth 4763 signal aspect added ; Leamington station signal aspects corrected | MR |
18-Jan-2018 | Nottingham | missing aspects in the Beeston area added | MR |
17-Jan-2018 | Paddington | Twyford area signal aspects corrected | MR |
16-Jan-2018 | Sheffield | Sheffield station signal aspects corrected | MR |
16-Jan-2018 | Stafford | Colwich area signal aspects corrected | MR |
02-Jan-2018 | Southeast London | Re-signalling of London Bridge area, Kidbrooke crossover removed | GN |
31-Dec-2017 | Paddington | Tidy-up and detailing | GN |
29-Dec-2017 | Birmingham | Corrected errors | TM |
24-Dec-2017 | Birmingham | Re-signalling of Perry Barr to Aston / Soho / Tipton | TM |
27-Dec-2017 | Manchester West | Market Street platform on Metrolink corrected. | GN |
27-Dec-2017 | Highland ML | Pitlochry alteration | GN |
27-Dec-2017 | Paddington | Re-signalling of Paddington area (Crossrail) | GN |
27-Dec-2017 | Glasgow QS | Re-signalling of Carmuirs area | TA |
26-Dec-2017 | Cupar | Re-signalling of Carmuirs area | TA |
24-Dec-2017 | Brighton | Revised Redhill layout | GN |
24-Dec-2017 | - | change log started | - |